| Sign In | Join Free | My frbiz.com |
|
| Brand Name: Yuhong | Certification: ABS, BV, DNV, CCS, LR |
| Minimum Order Quantity: 1PC | Delivery Time: According to the quantity |
| Payment Terms: TT, LC | Place of Origin: China |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: YUHONG GROUP | Certification: ASME, U STAMP, API,ASME, ABS, LR, DNV, GL , BV, KR, TS, CCS |
| Minimum Order Quantity: 1PC | Delivery Time: 5---75 days |
| Payment Terms: L/C, T/T | Place of Origin: CHINA, KOREA |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Active Member | |
| Brand Name: YUHONG | Certification: ABS, DNV-GL, LR, BV, CCS, KR, ASME, TUV, SGS, BV, IEI, IBR, ISO9001, ISO 14001, ISO 18001 |
| Model Number: Extruded Fin tube , Aluminum Extruded Fin tube | Minimum Order Quantity: 1 PC |
| Delivery Time: 5 - 90 Days | Payment Terms: L/C,T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
| Model Number: ASTM A249 TP304 | Minimum Order Quantity: 10PC |
| Delivery Time: 15-35 DAYS | Payment Terms: L/C, L/C, T/T |
| Yuhong Group Co.,Ltd [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: DELLOK | Certification: CE. ISO,EN10204. 3.1 Cert. |
| Model Number: DR | Minimum Order Quantity: N/A Contact us for details |
| Delivery Time: within 15days | Payment Terms: L/C, T/T Contact us for details |
| Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Reliance | Certification: CE,ISO... |
| Model Number: DR | Minimum Order Quantity: N/A |
| Delivery Time: Ex-work within 1 month on receipt of order. | Payment Terms: T/T, L/C |
| JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: SAT-CHAM | Certification: ISO CE |
| Model Number: Straight fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T, Western Union |
| Jiangsu Sat-Cham Energy Technology Co., Ltd. [China] | |
| Verified Supplier | |
| Brand Name: HZFT | Certification: ISO9001:2008 |
| Model Number: H-07100.350175-00 | Minimum Order Quantity: 1 Pcs |
| Delivery Time: 1 - 30 Days | Payment Terms: L/C , T/T |
| Hangzhou Fin Tube Co., Ltd. [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: GNEE | Certification: ISO 9001 |
| Model Number: Finned Tube | Minimum Order Quantity: 1 ton |
| Delivery Time: 5-8 work days | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Gnee Steel (tianjin) Co., Ltd. [Henan,China] | |
| Verified Supplier | |
| Brand Name: HDT | Certification: ISO9001,ASME,Grade A,SGS,EN,TUV |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 20 tons |
| Delivery Time: 60-75days after getting the down payment or L/C | Payment Terms: L/C, T/T, Western Union, MoneyGram |
| ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Torich | Certification: ISO |
| Model Number: SA213 | Minimum Order Quantity: 1tons |
| Delivery Time: 10-30days | Payment Terms: L/C, T/T |
| Torich International Limited [Zhejiang,China] | |
| Site Member | |
| Brand Name: TORICH | Certification: ISO 9001 |
| Model Number: Extruded Finned | Minimum Order Quantity: 1 Ton |
| Delivery Time: 4-6 Weeks | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: HD Boiler | Certification: ASME, ISO9001:2015, ISOEN3834 |
| Model Number: Fin tube | Minimum Order Quantity: 3 TONS |
| Delivery Time: Depands on Qty | Payment Terms: 30% after contract and balance 70% before shipment, or 100% L/C at sight |
| Zhangjiagang HuaDong Boiler Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: TOBO | Certification: SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
| Model Number: TP304/304L | Minimum Order Quantity: 1 pcs |
| Delivery Time: 15- 20 work days | Payment Terms: L/C, T/T, Western Union |
| TOBO STEEL GROUP CHINA [Shanghai,China] | |
| Verified Supplier | |
| Brand Name: Dehai Boiler | Certification: ISO9001 , SGS , ABS , ASME |
| Model Number: Serrated tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T |
| Zhangjiagang Dehai Boiler Co., Ltd [China] | |
| Verified Supplier | |
| Brand Name: TOYOCOOL | Certification: CE,ISO9000,NSF,CCC |
| Model Number: TY-CHILLER | Minimum Order Quantity: 1 |
| Delivery Time: 20-30 DAYS | Payment Terms: T/T,L/C |
| Shenzhen Toyocool Refrigeration Equipment Co., Ltd. [China] | |
| Verified Supplier | |
| Brand Name: SPEZILLA | Certification: ISO9001 |
| Model Number: G-fin L-fin LL-fin | Minimum Order Quantity: Negotiation |
| Delivery Time: 30DAYS | Payment Terms: L/C, T/T |
| Spezilla Tube Co., Ltd. (Shanghai) [Shanghai,China] | |
| Verified Supplier | |
| Brand Name: Trumony | Model Number: TR |
| Minimum Order Quantity: 5 tons | Delivery Time: Within 35 days after received your deposits. |
| Place of Origin: China | Price: Negotiable |
| Trumony Aluminum Limited [Jiangsu,China] | |
| Site Member | |
| Brand Name: FLRS or OEM | Certification: ISO9001 |
| Model Number: FLRS-P002 | Minimum Order Quantity: 1 piece |
| Delivery Time: 8-20days | Payment Terms: T/T, L/C, Western union, paypal |
| Shaanxi Flourish Industrial Co., Ltd. [China] | |
| Verified Supplier | |