Sign In | Join Free | My frbiz.com |
|
Categories | Metal Saddle Clip |
---|---|
Brand Name: | ZS |
Place of Origin: | Hebei China |
MOQ: | 2000 |
Price: | Discussion |
Payment Terms: | T/T |
Delivery Time: | 7-15 work days |
Packaging Details: | According to requirements |
Material: | Stainless steel, Metal |
Type: | Hardware Tools |
Application: | Industrial |
Technics: | hot galvanized |
Process: | Bending |
Surface: | Smooth and uniform |
Quality: | High-quality |
Features: | Corrosion resistance |
Company Info. |
Langfang Zhousheng Metal Products Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Introduction
Stainless steel saddle clamps are a fixing accessory used to fix stainless steel pipes during installation and laying. In order to avoid deflection, swaying, and falling of outdoor pipes, stainless steel saddle clamps must be used for fixing. Moreover, this type of stainless steel saddle clamp has a firmly fixed protective effect on the water supply pipes of high-rise buildings.
Advantage
1. Strong bearing capacity, stable and not easy to deform, simple
and stable structure, good load-bearing capacity, and durability.
2. The cut is flat, the steel composition is uniform, and the
cutting head section is smooth and neat, without burrs.
3. Anticorrosion, rust prevention, acid resistance, alkali
resistance, corrosion resistance, stable performance, and
durability
.
FAQ
Q: Are you a trading company or a manufacturer?
A: We are both manufacturers and exporters.
Q: Why did you choose your company?
A: We are one of the professional cable bridge manufacturers in China. We not only have our own warehouse and production workshop, but also have a huge galvanizing plant. Therefore, our company has advantages in price and quality, and we can provide you with cable trays of any type and material.
Q: Can the product quality be guaranteed?
A: Honey, we can. We have skilled employees and advanced production equipment. We strictly implement the quality control system.
Q: How long is your delivery time?
Answer: If the goods have inventory, it is generally 5-15 days, or if the goods do not have inventory, it is 15-30 days, depending on the quantity.
![]() |