Sign In | Join Free | My frbiz.com |
|
Categories | Steam Hot Water Boiler |
---|---|
Brand Name: | HD Boiler |
Model Number: | Steam Hot Water Boiler |
Certification: | ISO9001,ASME,Grade A,SGS,EN |
Place of Origin: | CHINA |
MOQ: | 1 set |
Price: | Negotiable |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 500 tons per month |
Delivery Time: | 30~50 days |
Packaging Details: | Iron Frame Packing |
Style: | Horizontal |
Output: | Steam,Hot Water |
Fuel: | Gas-fired,electric |
Application: | Industrial Production,school,eps oroduction line |
Product name: | Horizontal Electric Steam Hot Water Boilers |
Color: | Customer's Requirement |
Company Info. |
Zhangjiagang HuaDong Boiler Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Energy Saving Electric Steam Hot Water Boilers For Industry & Power Station
Product Infomation
Advantages
Parameter
Model | SZL6- 1.25-AII 1.6-AII 2.5-AII | SZL8- 1.25-AII 1.6-AII 2.5-AII | SZL10- 1.25-AII 1.6-AII 2.5-AII | SZL15- 1.25-AII 1.6-AII 2.5-AII | SZL20- 1.25-AII 1.6-AII 2.5-AII | SZL25- 1.25-AII 1.6-AII 2.5-AII | SZL30- 1.25-AII 1.6-AII 2.5-AII | |
Rated heating efficiency(MW) | 6 | 8 | 10 | 15 | 20 | 25 | 30 | |
Rated working pressure(MPa) | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | |
Rated steam temperature | 193/2 04/226 | 193/2 04/226 | 193/2 04/226 | 193/2 04/226 | 193/ 204/226 | 193/204/226 | 193/204/226 | |
Rated outlet temperature | 60 | 60 | 60 | 60 | 104 | 104 | 104 | |
Heating area | Boiler(m2) | 156 | 197.4 | 235.6 | 412 | 508 | 510 | 588.6 |
Coal econo mizer(m2) | 87.2 | 157 | 174.4 | 413/413/236 | 357 | 496 | 450 | |
Air pre heater (m2) | -/-/181 | 199 | 212 | 210 | ||||
Effective area of grate(m2) | 7.8 | 10.1 | 11.8 | 17.3 | 21 | 24.3 | 25.8 | |
Water volume(m3) | 7.3 | 9.6 | 12.4 | 15.3 | 21.6 | 27 | 27.6 | |
Design efficiency(%) | 80 | 80 | 80 | 80 | 80 | 80 | 80 | |
Applicable fuel | Soft Class II | |||||||
Maximum size of shipping part(m) | 6.1× 3.1×3.5 | 6.8× 3.4×3.5 | 7.6× 3.4×3.5 | 9.6× 3.4×3.54 | 11× 3.41×3.54 | 8.3× 3.0×3.6 | 8.5×3.6×3.64 | |
Maximum weight of shipping part(t) | 25 | 29 | 31 | 42 | 50 | 22/28 | 23/29 | |
Overall size of installation(m) | 9.5× 5.5×6.2 | 9.5× 5.5×6.2 | 9.8× 5.7×6.2 | 10.9 ×5.7×6.7 | 12× 5.8×6.8 | 13.8× 6.0×10.6 | 18×6×10.5 | |
Draught fan | GY6-1 30kw | GY10-1 45kw | GY10-15 55kw | Y5-47 12D 75kw | GY5-47 12.4D 90kw | GY20-15 110kw | GY35-15 132kw | |
Blower fan | T4-72 5A 11kw | GG10-1 15kw | GG10-1 15kw | G4-73 9D 30kw | G4-73 9D 30kw | GG20-15 55kw | G40-73 10D 55kw | |
Speed governor | GL-10P 0.75kw | GL-16P 1.1kw | GL-16P 1.1kw | GL-20P/II 1.5kw | GL-20P/II 1.5kw | GL-30P 2.2kw | GL-40P 3kw |
Company Introduction
Design and development
Collect all parameters for product design, make design acording to
the Supervisory Regulations on Boiler Safety Technology, other
laws, rules, regulations and professional standards, and 100% meet
the product standards and customers' requirements.
Supervision and confirmation
The quality and technical supervision administration authorizes the
inspection agency stationed on site to supervise, inspect and test
the process of boiler manufacturing.Accept supervision or
confirmation of the third party or Customer's representative over
the process of boiler manufacturing.
![]() |