Sign In | Join Free | My frbiz.com |
|
Categories | Copper Pipe Heat Sink |
---|---|
Place of Origin: | Guangdong, Mainland China |
Brand Name: | LF |
Certification: | ISO9001:2008 |
Model Number: | LF-ZHY0466 |
MOQ: | 100 PCS |
Price: | Negotiable |
Packaging Details: | Plastic Tray Or Customized |
Delivery Time: | MOQ 1 Week, 5000pcs 4 Weeks |
Payment Terms: | T/T, Western Union |
Supply Ability: | 30,000pcs Per Month |
Company Info. |
LiFong(HK) Industrial Co.,Limited |
Verified Supplier |
View Contact Details |
Product List |
Big Power Copper Pipe Emboided Heat Sink For Projector
Quick Details:
Precision Copper Pipe Heat SInk
Large Image: Aluminum Fin Heat Sink with Copper Pipe
Materials: Pure Copper C1100 Strips, Purity over 99.5%
Depend on customer's requirements
Description:
Large Image: Aluminum Fin Heat Sink with Copper Pipe
200W Big Power Copper Pipe Heat Sink
Copper Pipe Heat Sink for Projector
Heat Sink With Copper Pipe For Projector
Application:
Projector
Specification:
Overall Dimension | L250*W100*H30mm |
Aluminum Fin Thickness | 0.4mm |
Fin Quantity Per Row | 94 pcs |
Aluminum Block Size | 100*50mm |
Copper Tube | 8mm in Dia |
Tube Quantity | 4 pcs |
Part Weight | 350 Gram |
Material: | Pure Copper C1100 Strips, Purity over 99.5% (Standard: JIS
H3250-2006); Pure Aluminum Board A1060 Purity Over 99.6%
.(Standard: GB/T3880-2006). |
Facility:
Stamping
Automatic Tube Forming Machining
Overflow Welding/Drying Machine
Processing Technic:
1. Copper Fins: Progressive Die Stamping
2. Aluminum Board: Extrusion+ CNC Machining
3. Copper Tube Forming : Automatic Tube Bending+ Burn into Tip
Ends.
4. Aluminum Board and Enclosure Nickle Plated, Copper Fin Passivate
(Insulation,
Oxidation and Corrosion Resistance).
5. Assembly: Automatic Fin Wearing/Assembly, then Fixed by Overflow
Soldering and
Screw/Rivet Combination.
6. Quality Check
7. Packing
Advantages:
1. Professional Research and Design Team, Strong & Automatic
Equipments: Progressive
Stamping, Automatic Tube Bending Machine, Automatic Fin Wearing
Machining
2. Strict Quality Control in Each Process and Finish Product
Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily
Communication
![]() |