Sign In | Join Free | My frbiz.com |
|
Categories | Steel Structure High Rise Building |
---|---|
Brand Name: | CT Steel Structure |
Model Number: | Multistorey86101 |
Certification: | SGS |
Place of Origin: | China |
MOQ: | 100 Square Meters |
Price: | USD 30-60 / square meter |
Payment Terms: | T/T,L/C |
Supply Ability: | 200000 tons / year |
Delivery Time: | 3-5 weeks |
Packaging Details: | 40hq |
Frame: | H section |
Name: | Steel Structure High Rise Building |
Teaching Hospital: | Yes |
Construction Method: | Prefabricated |
Design Load: | Wind, Snow, Seismic |
Cost: | High |
Secondary Struct: | Galvanized Purlin, Supporting Part |
Door Type: | Roll-up |
Sandwich Panel Thickness: | Between 50-200mm |
Material: | Steel |
Fire Resistance: | High |
Company Info. |
China CT Steel Structure Group Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Steel Structure Convention Center High Rise Building Frame Auditorium
The Steel Structure Convention Center High-Rise Building Frame Auditorium is a state-of-the-art architectural marvel designed to meet the demands of large-scale convention centers, auditoriums, and high-rise buildings. This product leverages advanced engineering techniques and premium-quality steel materials to deliver exceptional strength, flexibility, and durability. Whether you're planning a massive convention center or an iconic auditorium, this steel structure ensures superior performance while maintaining aesthetic appeal.This solution caters to both functional and design requirements, offering a seamless blend of innovation, reliability, and cost-effectiveness. It is ideal for projects that require vast open spaces, multi-functional areas, and sustainable construction practices.
Specification
Parameter | Specification |
---|---|
Structure Type | Steel Frame |
Maximum Span | Up to 100 meters |
Height Range | 10–50 meters |
Load Capacity | Wind Load: 0.8 kN/m² Seismic Load: 8 Magnitude (based on region) |
Material Grade | Q345B/Q355C/Q390D |
Fire Resistance | Up to 3 hours (with fireproof coating) |
Corrosion Protection | Galvanized coating or epoxy paint |
Insulation Performance | Meets LEED standards |
Construction Time | Approximately 3–6 months (depending on size) |
Environmental Impact | Recyclable materials, low carbon footprint |
![]() |