Sign In | Join Free | My frbiz.com |
|
Categories | Overhead Insulated Cable |
---|---|
Brand Name: | Zhenglan Cable |
Model Number: | 1/0 AWG POLY / ALUMINIUM QUADRUPLEX CABLE, 19 STRANDS ICEA S-76-474 |
Certification: | ISO 9001:2015,ISO 14001:2005; CCC |
Place of Origin: | Henan, China |
MOQ: | 1000m |
Price: | Negotiable |
Payment Terms: | L/C, T/T |
Supply Ability: | 15,000 KM/Year |
Delivery Time: | 10 days |
Packaging Details: | Wooden drum, iron wooden drum or as required |
Insulation Material: | XLPE |
Cable conductor: | Aluminum |
Standard: | ICEA S-66-524 (NEMA WC7) |
structure: | AAC/XLPE |
Voltage: | 0.6/1KV |
Port: | Qingdao or Shanghai |
Company Info. |
Zhenglan Cable Technology Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
1/0 AWG POLY / ALUMINIUM QUADRUPLEX CABLE, 19 STRANDS ICEA S-76-474
Application
To supply 120 volt aerial service for temporary service at
construction sites, outdoor or street lighting. For service at 600
volts or lower at a conductor temperature of 75°C maximum.
Applicable Standard
ASTM B 230
ASTM B 231
ASTM B 232
ASTM B 233
ICEA S-66-524 (NEMA WC7)
Construction
Concentric strand or compressed 1350-H19 conductor, polyethylene or
cross-linked polyethylene insulation, concentric strand AAC, ACSR,
or 6201 alloy neutral messenger.
Technical Data
Products images:
Why Choose Zhenglan Cable:
FAQ
Is your company a factory or a trade company?
Factory, more than 20 years in China
How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the
samples will be ready for delivery in 3-7 days. The samples will be
sent to you via express and arrive in 3~7 days. You can use your
own express account or prepay us if you do not have an account.
What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as
the main payment terms, and other payment can also be negotiated.
Trade assurance on is also available.
What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity.
Usually it needs 7-30 days after get your payment.
What is your MOQ?
Generally it is 5000m.
![]() |