Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Used Machinery & Equipment >

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Categories Excavator Pile Driving
Brand Name: Zhonghe
Model Number: DZB005
Certification: CE
Place of Origin: Guangdong, China
MOQ: 1 piece
Price: $6300-$3400/pieces
Payment Terms: T/T
Supply Ability: 60 Piece/Pieces per Month
Delivery Time: 15-20 work day
Packaging Details: wood case
Suitable Excavator(ton): 20-85T
Product name: excavator pile driving boom
Marketing Type: New Product 2022
After-sales service provided: Online support
Color: Yellow/Gray/Red/Green/Customizable
Material: Q355B Q690D
Application: Excavator Attachment
Condition: 100%New
Applicable industries: Construction works,Machinery Repair Shops,Energy & Mining,Building Material Shops
Weight: 2700-9000KGS
Packing: Bubble bag packaging
Capacity: 0.6-2.5 cbm
MOQ: 1 PCS
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Pile Driver Attachment For Excavators


2024 Zhonghe Machinery Catalogue 3M.pdf


Product Description-----Excavator Pile driving Boom Arm

What is an excavator piling arm?

An excavator piling arm is a specific configuration of excavator arm equipped or modified for piling.



What are your advantages?

Advantages of excavator piling arm:

1. Increase the thickness of the upper and lower plates of the boom and adopt double reinforcement inside. The stress points of arm lugs are treated with segmented thickened plate, which improves the overall service life of piling arm.


2. The opening angle between piling arm and arm can be up to 160 degrees, and the opening angle between piling arm and base can be up to 88 degrees, which improves the overall drilling and pulling force and working efficiency.


3. The piling arm is welded and then drilled, the precision is as high as the original piling arm, which prolongs the service life.



Some common size references

Excavator
(ton)
Total Length
(mm)
Boom
(mm)
Arm(mm)

Pilling Height

(mm)

Counterweight
(ton)
30-3613800100003800154003T
30-3615000105004500171005T
40-4515800110004800179003T
40-4516800115005300185005T-6T
45-5019000125006500210006T-7T

Product Detail Display


Telescopic Boom Arm Engineering Case


About Hydraulic Vibratory Pile Driving Hammer


1. Part of engineering applications:

Municipal sewage pipeline laying, land reclamation, bridge cofferdam, building foundation, high-speed railway foundation treatment, highway soft foundation treatment, wharf engineering, deep foundation pit support, etc.


2. Hydraulic vibratory hammer consists of four main components:
Boom assembly, frame assembly, housing assembly and fixture assembly.
It is mainly used for piling, such as driving reinforced concrete piles and steel sheet U-piles into the ground to reinforce the foundation, and then supporting the structure or fixing the building.

Related Product Recommendation
excavator long reach boom sliding boom/telescopic boom
two-section telescopic boom two-section demolition boom

About Our Company------Zhonghe Machinery


CE certification & Utility model patent certificates

Shipping And Packaging

Our products have been sold to more than 60 countries and are shipped by sea, land and air. Our packaging is in wooden crates or stretch film packaging. Goods are packed before shipment and then loaded into containers to ensure the safety of the goods.

Some questions and answers that may interest you

Q: Are you a manufacturer?

A: We are a manufacturer/supplier of excavator arms and attachments. We have a super-large factory which covers an area several times larger than our competitors. We are the largest manufacturer of excavator accessories in Guangdong Province with full production facilities and export our products to more than 60 countries around the world.


Q: What is the material of the piling arm?

A: We generally use Q355B material. If the customers have higher requirements on the material, we can use Q690D material or other high strength materials.


Q: How to allocate the arm frame and arm length of the piling arm more reasonably?

A: The length of the boom minus the length of the arm is equal to 5.5 meters, not less than this length. When the jib and boom are folded for transportation, the vibrating hammer will hit the excavator and the transportation height is too high.


Q: What are the design requirements of the piling arm?

A: The opening angle between the movable arm and the bucket of our piling arm is basically 160°, and the angle between the movable arm and the horizontal plane can be up to 88°.


If you want to learn more details, just contact Ada

Whatsapp: +86 15322105263

Teil/Wechat: 0086 15322105263

E-mail: abby@excavatorboomarm.com



Quality 20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer for sale
Send your message to this supplier
 
*From:
*To: Kaiping Zhonghe Machinery Manufacturing Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0