Sign In | Join Free | My frbiz.com |
|
Categories | Ceiling Light Lens |
---|---|
Brand Name: | ChenMu |
Model Number: | CM-S3707-A25D-7H1 |
Certification: | ROSH,UL,SGS |
Place of Origin: | Zhejiang,China |
MOQ: | 10000 PCS |
Price: | Negotiable |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 10000pcs/per week |
Delivery Time: | 3-5 working days |
Packaging Details: | Cartons |
Emitting Color: | Warm White |
Angle: | 25 Degree |
Usage: | Indoor |
Transmittanc: | 90% |
Description: | Optical Grade,Led Spotlight Lens |
Style: | Modern |
Led Light Source: | SMD,LED |
Suitable Led: | led 3030/2835 |
Company Info. |
ChenMu Lighting technology co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Low Glare LED Light Lens For Lighting Needs In Commercial Applications
Quick detail
Product Name: | CM-S3707-A25°-7H1 | Beam Angle: | 25° |
Efficiency: | 90% | Material: | PMMA |
LED Chips: | 3030/2835 | Dimmable: | Ø36.8*6.7mm |
Application: | Bridge guardrail lights, road ramp lights and other low-level lighting fixtures |
Description
Low Glare LED Light Lens For Lighting Needs In Commercial Applications
Specifications
Product Name: | CM-S3707-A25D -7H1 |
Beam Angle: | 25° |
Efficiency: | 90% |
Material: | PMMA |
LED Chips: | 3030/2835 |
Size: | Ø36.8*6.7mm |
Application: | Bridge guardrail lights, road ramp lights and other low-level lighting fixtures |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery:
Trade Terms: | EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
![]() |