Sign In | Join Free | My frbiz.com |
|
Categories | COB LED Lens |
---|---|
Brand Name: | ChenMu |
Model Number: | CM01LS-S4015-XX |
Certification: | ROSH,UL,SGS |
Place of Origin: | Zhejiang,China |
MOQ: | 2000 PCS |
Price: | Negotiable |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 10000pcs/per week |
Delivery Time: | 3-5 working days |
Packaging Details: | Cartons |
Material: | Optical grade PC |
Body Material: | Optical PC |
Color Temperature: | 3000K/4000K/5000K/5700K/6500K |
Cri: | Ra>70/Ra>80/Ra>90 |
Current: | 1000mA |
Led Chip Brand: | Philips Lumileds/OSRAM/CREE/NICHIA/Seoul Semiconductor |
Led Chip Type: | SMD3030/SMD5050/SMD2835/COB |
Application: | Residential |
Company Info. |
ChenMu Lighting technology co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
∅40Mm With Lens Holder For Downlights, Spotlights, Rail Lights, Track Lights
Quick detail
Product Name: | CM01LS-S4015-XX | Beam Angle: | 25/38 |
Efficiency: | 92% | Material: | PC |
LED Chips: | COB | Dimmable: | ∅39.5*16.6mm |
Accessory: | SMD LED+PCB+outer shell | ||
Application: | Flood Lighting,High Bay Lighting,Street Lighting ect. |
Description
∅40Mm With Lens Holder For Downlights, Spotlights, Rail Lights, Track Lights
Specifications
Product Name: | CM01LS-S4015-XX |
Beam Angle: | 25/38 |
Efficiency: | 92% |
Material: | PC |
LED Chips | COB |
Size: | ∅39.5*16.6mm |
Accessory: | SMD LED+PCB+outer shell |
Application: | Flood Lighting,High Bay Lighting,Street Lighting ect. |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery:
Trade Terms: | EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
![]() |