Sign In | Join Free | My frbiz.com |
|
Categories | Underground Mining Excavator |
---|---|
MOQ: | 1 |
Price: | negotiate |
product name: | Underground Mining Excavator |
Applicable Industries: | Construction works |
Marketing Type: | Ordinary Product |
Certificate: | ISO9001 |
Feature: | mineral equipment |
Keywords: | Mucking Loader |
Certification: | ISO |
Place of Origin: | shandong |
Brand Name: | Shante |
Packaging Details: | package |
Payment Terms: | negotiate |
Delivery Time: | 5-8 day |
Company Info. |
Shandong Shante Heavy Industry Machinery Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Electric Mini Digger
Stop period
• The piston rod must be coated with anti corrosive coating, and the air inlet and air outlet of air filter must be sealed.
• All devices shall be preheated and test run for 15 min or so after stop for 6 months.
• The protective measures must be taken after test run.
9.7.3 End of stop period
The following steps shall be taken when the excavator is reused:
• The anti corrosive coating must be removed from the piston rod.
• The air inlet and air outlet of air filter must be opened.
• Check the main filter element/security filter element of air filter; if necessary, replace it.
• Clean the excavator with neutral detergent.
• If the stop period is beyond 6 months, the oil in different devices (such as transmission device) must be replaced.
• If the stop period is beyond 6 months, the hydraulic oil filter (the installed pressure filter, return oil filter and breathing filter) must be replaced.
• The excavator must be lubricated according to the lubrication schedule. See the layout of lubricating points.
Parts diagram:
![]() |