Sign In | Join Free | My frbiz.com |
|
Categories | Corrugated Cardboard Sheets |
---|---|
Brand Name: | Bmpaper |
Model Number: | Corrugated Paper |
Certification: | ISO, SGS |
Place of Origin: | China |
MOQ: | 1 ton |
Price: | Negotiable |
Payment Terms: | T/T, Western Union |
Supply Ability: | 100,000 tons per quarter |
Delivery Time: | 3 - 35 working days |
Packaging Details: | Sheet & roll |
Product name: | Corrugated paper |
Pulp style: | Recycled |
Thickness: | 1mm - 8mm |
Advantage: | High strength |
Sample: | Free A4 size and freight collect |
Layer: | Single face, 2 layers to 9 layers |
Company Info. |
Guangzhou Bmpaper Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
► Corrugated Paper Feature and Usage
• Ferture →
large volume | light weight | high strength | good cushioning properties |
good folding | space saving | easy handling | Simple processing |
• Usage →
1. Corrugated paper is particularly suitable for the transport and packaging of heavy products such as machinery and electricity.
2. A and B-corrugated are generally used as outer packaging boxes
for transport, and beer boxes are generally made from B corrugated.
4. E-corrugated is mostly used as a single-piece packaging box with
certain aesthetic requirements and appropriate weight of contents
5. F-corrugated and G-corrugated, collectively known as
micro-corrugated, are extremely thin corrugated boxes used as
disposable packaging for foodstuffs such as hamburgers and
cream-filled pastries,or as packaging for microelectronic products such as digital
cameras and portable stereos, as well as refrigerated goods.
► Corrugated Paper Pictures
► Packing and Shipping
• Packing :
1. Sheet packing : Wrapping with waterproof kraft paper and
waterproof clear film on the wooden pallet.
2. Roll packing : Wrapping with waterproof kraft paper and waterproof clear film on the wooden pallet.
Other packing way as your requirement.
All Packaging strictly comply to internationalexport standards.
• Shipping :
1. Port : Guangzhou Nansha Port Or Shenzhen Yantian/ Shekou Port.
2. Lead time : 5 - 15 working days ( According to negotiation ).
3. Transport : By sea, by air, or other courier services company.
![]() |