Sign In | Join Free | My frbiz.com |
|
Categories | Ceiling Light Lens |
---|---|
Brand Name: | ChenMu |
Model Number: | CM01LS-S1609-A12D-AEA35 |
Certification: | RoHS |
Place of Origin: | Zhejiang,China |
MOQ: | 1000PCS |
Price: | Negotiable |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 20000PCS/Day |
Delivery Time: | 3-5 working days |
Packaging Details: | In Carton Box |
Emitting color: | Warm White,Cool White |
Operating temperature(℃): | -40 - 100 |
Emitting Color: | Warm White |
Transmittanc: | 92% |
Material: | Polycarbonate |
Energy Star Certified: | Yes |
Description: | Optical Grade,Led Spotlight Lens |
Company Info. |
ChenMu Lighting technology co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
PC LED Lens For Wall Washer Light With 3030 3535 LED Chips And Phi 16*16mm Size
Quick detail
Product Name: | CM01LS-S1609-XX-AEA35 | Beam Angle: | 12°Degree |
Efficiency: | 92% | Material: | PC |
LED Chips | 3030 3535 | Size: | Φ16*16*9.2mm |
Application: | Wall Washer Light led Spotlight | ||
Other Light Distribution: | 12°20°30°45°60°15°x30°15°x60° |
Description
PC LED Lens For Wall Washer Light With 3030 3535 LED Chips And Phi 16*16mm Size
Specifications
Product Name: | CM01LS-S1609-XX-ADE35 |
Beam Angle: | 12°Degree |
Efficiency: | 92% |
Material: | PC |
LED Chips | 3030 3535 |
Size: | Φ16*16*9.2mm |
Application: | Wall Washer Light led Spotlight |
Other Light Distribution: | 612°20°30°45°60°15°x30°15°x60° |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket | Europe,South America,North America,Asia ect |
Shipping and Delivery:
Trade Terms: | EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
![]() |