Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Artificial Grass & Sports Flooring >

400 Meters Full PU Material Athletics Running Track Surface / High School Running Tracks

Categories Athletics Running Track
Brand Name: JRace
Model Number: JRace
Certification: IAAF
Place of Origin: China
MOQ: 500square meters
Price: USD 10-20 per square meter
Supply Ability: 50000Ton per year
Delivery Time: About 10 days after deposit
Packaging Details: Polyurethane liquid: iron barrel & plastic barrel
Application: For stadium
Surface color: Red generally
Thickness: Customized
Oversea Installation: Available
Flammability: Bf1-S
Hardness JIS A: 50-70
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

400 Meters Full PU Material Athletics Running Track Surface / High School Running Tracks

Full PU Material Athletics Running Track Surface Apply to 400 Meters Red Color Track


JRACE running ways are eco-friendly, seamless, cushioned, spike resistant surfaces with area, mixed or point elastic properties.

The high performance, seamless surface, is an in-situ applied rubber base layer, covered with multiple layers of an elastomeric structural spray polyurethane wear layer.

JRace running ways are water permeable, spike resistant, UV and all weather resistant.

They provide a durable track surface under all weather conditions.

And are suitable for outdoor athletic facilities, multipurpose sports facilities and playgrounds.


Product Data


Thickness(mm)13
Force Reduction %36.0
Vertical Deformation mm1.30
Skid Resistance BPN20°C53
Tensile strength MPa0.56
Elongation at Break %51.7
Flame Retardance1
Test Conclusion

Pass GB/T22517.6-2011;GB/T14833-2011


Product Package


NoItemSpecification
1PU Group A15kg/200kg/barrel
2103#Binder Glue20kg/200kg/barrel
3105#Binder Glue20kg/200kg/barrel
4PU 1:4 Primer A15kg/200kg/barrel
5PU 1:4 Primer B30kg/300kg/barrel
6PU Top Coat A15kg/200kg/barrel
7PU Top Coat B30kg/300kg/barrel
8Making Paint-White5.6kg/barrel
9Making Paint-Yellow, Blue, Green1.2kg/barrel
10Iron Oxide Red25kg/barrel
11Binder resin Material15kg/210kg/barrel
12Dryer15kg/180kg/barrel
13SBR Granule25kg/bag
14EPDM25kg/bag

Installation steps

Firstly, clean the concrete base and use the single component glue to seal the bottom. After that, mix totally the SBR granules with the single component glue in the rate of 1:7, then, flat the material to the tracks by paver. Next, spray the surface layer. When the surface is dry, can mark the white marking line.

Pls note that the layout, track lines and event markings are in accordance with the latest edition of the IAAF rules and regulations. After maintain 20 days, can run on the racks.


Why Choose JRace

  • Projects based on China, spreaded all over the world
  • JRace has its own brand, including R&D department and installation service.
  • Awarded ISO9001, ISO14001, OHSAS18001, IAAF, ITF certified etc.
  • National High-tech Enterprises.
  • Credit Well-kept Enterprises.
  • Being listed in the Government Procurement List.

The establishment of effective brand building of the road,the company developed a more standardized,broad.In the manufacturing field,we have made a variety of industry certification authority;in the field of business we get positive recognition from all sectors of society.Is the quality,detail,seriously,insisting that the brand is more drnamic;standard,responsibility,honor and encourage us to carry over the mission,and creat the future.

Quality 400 Meters Full PU Material Athletics Running Track Surface / High School Running Tracks for sale
Send your message to this supplier
 
*From:
*To: Guangzhou JRace Athletic Facilities Co., Ltd. 
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0