Sign In | Join Free | My frbiz.com |
|
Categories | Power Transmission Poles |
---|---|
Brand Name: | Milky Way |
Model Number: | 11M Class 3 Africa galvanized power distribution pole AWS D1.1 |
Certification: | /BV/ISO |
Place of Origin: | China |
MOQ: | one 40 HQ |
Price: | negotiation |
Payment Terms: | T/T |
Supply Ability: | 300 pieces pole per day |
Delivery Time: | usually 2 weeks after confirming |
Packaging Details: | as per customer request |
Thickness: | 3mm |
Welding standard: | AWS D1.1 |
tolerance: | +/-2% |
Design Load in Kg: | 300~ 1000 Kg applicated to 50cm from the to pole |
Height: | 11m |
Material: | Yield strength not less than 345MPa |
Surface treatment: | Hot dip galvanized |
Shape: | Octagonal |
Company Info. |
Jiangsu milky way steel poles co.,ltd |
Verified Supplier |
View Contact Details |
Product List |
11M Class 3 Africa galvanized power distribution pole AWS D1.1
Material: | minimum yield strength is 345Mpa |
Mounting Height: | 3-30m or according to the requirements of customers |
Shape of pole: | Round,conical,octagonal,square,mid hinged,polygonal shafts are made of steel sheet that folded into required shape and welded longitudinally by automaticarc welding machine |
Brackets: | Single or double brackets are in the shape and dimension as per customers requirement |
Base plate: | Base plate is square or round in shape with slotted holes for anchor bolt and dimension as per customers requirement |
Groung mounted: | The length buried underground as per customers requirement |
Galvanizing: | Hot dip galvanization with thickness of 80-100µm average |
Powder coating: | Pure polyester powder painting, color is optional |
Main Features
1. Price Term: EXW, FOB, CFR or CIF.
The price includes pole shaft, base plate, cross arm and anchor
part.
Shipping seaport: Shanghai Seaport. For FOB, CFR or CIF price,
please specify which exact model you need, and tell us your order
quantity so that we can calculate the local transport charges and
sea freight.
2. MOQ: 1 sets for Customized
3. Payment: Typically 30% by T/T as deposit, balance by T/T or L/C
at sight before shipment. Other payment way can be negotiated.
4. Delivery time : goods can be ready for shipment within 10
workdays after receiving deposit.
5 Warranty : 30 years
6.Surface treatment :hot dip galvanization
![]() |