Sign In | Join Free | My frbiz.com |
|
Categories | EPE Underlayment |
---|---|
Brand Name: | No Brand |
Model Number: | EPE 20-2W |
Certification: | SGS |
Place of Origin: | China |
MOQ: | 1000 sqm |
Price: | Negotiable |
Payment Terms: | T/T |
Supply Ability: | 1 million sqm per week |
Delivery Time: | 12WORKING DAYS |
Packaging Details: | packed with shrink wrapped |
Material: | EPE foam |
Coating: | transparent PE film |
Thickness: | 2mm |
Density: | 20kg/m3 |
Color: | white |
Size: | 200sqft |
Application: | laminate floor, wood floor |
Feature: | moisture proofing |
2mm White EPE With Transparent PE Film Underlayment For Laminate Flooring Moisture Proofing
Introduction:
EPE is a basic type of flooring underlay, it is an important
moisture barrier and cushioning, it is also a very important
ingredient in producing a floor with a quality sound. With foil
backing will increase the property of thermal plus.
Suitable area:
Laminate floor, wood floor, engineered floor, hardwood floor,
floating floor, sub-floors, etc.
Features:
Creates a vapor/moisture resistant floor
Meets minimum requirements for most brands of flooring
Mold and mildew resistant
Includes adhesive strip and overlap film for linking multiple rolls
cushions flooring
Description | EPE foam with PE film | |||||
Color | white | |||||
Density | 20kg/cbm | |||||
Roll size | 200 sq.ft | |||||
Thickness | 2mm | |||||
Coaing | transparent PE film |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free
of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to
keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section
using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping
film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is
flush up against the other piece of underlayment and on top of the
overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
![]() |