Sign In | Join Free | My frbiz.com |
|
Categories | Laminate Floor Underlay |
---|---|
Brand Name: | No Brand |
Model Number: | EPE 20-B |
Certification: | SGS |
Place of Origin: | China |
MOQ: | 1000 sqm |
Price: | Negotiable |
Payment Terms: | T/T |
Supply Ability: | 1 million sqm per week |
Delivery Time: | 12WORKING DAYS |
Packaging Details: | packed with shrink wrapped |
Name: | 2mm Blue EPE Laminate Floor Underlay |
Material: | EPE foam |
Thickness: | 2mm thickness |
Density: | 20kg/m3 |
Color: | blue |
Size: | 200sqft |
Application: | laminate flooring |
Feature: | sound reduction, moisture proofing |
2mm Blue EPE Foam With PE Film Laminate Floor Underlay For Noise Reduction
Introduction:
2 mm Thick EPE Flooring Underlayment Padding with Tape & Vapor
Barrier 3 in 1 Heavy Duty Foam
Features:
Mold and moisture protection, non allergenic, 2mm closed foam
technology for sound reduction
Anti-crush technology for excellent performance & long life;
Perfect for wood, Bamboo and laminate floors easy installation with
self adhesive strip
Blue underlayment padding with tape & vapor barrier 3-in-1 heavy
duty foam
Easy installation with overlap and adhesive strip
Roll Cover: | 18.6m2 |
Roll Width: | 1100mm |
Roll Overlap | 100mm |
Thickness | 2mm |
Moisture Resistance Foil | blue PE film |
Material: | EPE |
Antimicrobial: | No |
Moisture Resistant | Yes |
Cushioning: | Yes |
Commercial / Residential: | Residential |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free
of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to
keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section
using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping
film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is
flush up against the other piece of underlayment and on top of the
overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
![]() |