Sign In | Join Free | My frbiz.com |
|
Categories | Outdoor Sports Surfaces |
---|---|
Brand Name: | SDONG |
Model Number: | SB01-801 |
Certification: | IAAF / ITF / ISO9001:2008/ ISO14001/ ISO18001/ SGS |
Place of Origin: | Guangzhou, China |
MOQ: | 500 sq.m |
Price: | Negotiable |
Payment Terms: | L/C, T/T, Moneygram, Paypal, Western Union |
Supply Ability: | 10000 sq.m per Month |
Delivery Time: | 10 days after your deposit |
Packaging Details: | Pack in barrel / carton/ fiber bag |
Product Name: | Multicolor Track Flooring Material |
Application: | Sports Venues |
Material: | EPDM surface & Nature rubber base + PU Binder |
Thickness: | 9-15mm, recommend 13mm |
Color: | Acid Grey,Red,green,blue, or customized |
Base: | indoor floor or outdoor cement & asphalt |
Standard: | ISO9001:2008/ISO14001/ISO18001/SGS |
features: | Water permeable,breathable,excellent elasticity, and odorless |
Sample: | Free |
Skid Resistance: | 53 |
Width: | 1.22m |
Surface: | Tartan Full PU running track |
Packed: | Packing in Roll/ barrel /carton/ fiber bag |
Waterproof Athletic Running Track Multicolor Track Flooring Material
Product Description
Directly factory synthetic running track paint in sport
We have three kinds of rubber running track which is spray track , sandwich track , full pu track .
Bellow is my spray track details :
Plz contact me to get my best price ,thank you very much .
Quick detail
Type:Sandwich System Running Track.
Feature: most economical, all weather use, good flatness, perfect for cold area.
Base:cement or asphalt
Thickness:9-13MM(or customized).
product name | Full PU Athletic Track |
Ingredients | EPDM granules + PU Binder |
Thickness | 9-15mm (recommend 13mm) |
Color | red, blue and customized |
Base | cement or asphalt |
Usage | school, communities, stadium, training center |
Special Conquest | Non-poisonous, harmless and odorless |
Service Life | 6-10 years |
Benefits:
Full Pu Athletic Track Instructions:
Perfect integration with nature, only need to add a very small amount of water in the plastic, mix for 2 minutes evenly, spray on the base wait 24 hours to dry naturally, and then spray EPDM anti-skid surface twice, can be completed. Short construction period ,about 1 week.
Applications:
Applicable to all types of schools at all levels and professional
stadium, athletics track, semicircle area, |
Project photos:
Our Services
Best service: Any inquiry will be replied in 24 hours. Timely and
professional service all the time.
Best price: Reliable factory , direct selling,charming price for
you!
Free sample: Provide free sample within 2kg, you just need to pay
for the sample Express fee.
After-sale service: Provide free training lesson for our oversea
distributor or buyer, professional
product & construction knowledge for you.
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory
inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are
available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to
assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and
recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our
customers benefit ;
2. We respect every customer as our friend and we sincerely do
business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the
photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more
suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying
great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix.
Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.
![]() |