Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Ladders & Scaffoldings >

Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg

Categories UV CIPP Equipment
Brand Name: DAO
Model Number: D919
Place of Origin: Jiangsu, China
MOQ: 1 piece
Price: Variable
Payment Terms: T/T
Supply Ability: 500pcs per month
Delivery Time: 10 working days
Packaging Details: Normal
Application: Size Extension
Diameter: DN250
Length: 0.2m
Brand: DAO
Material: Stainless Steel
Life: 50 years
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg

D919 UV curing equipment pipeline inspection and repair equipment custom lamp bracket leg


Requirement for UV trenchless repair construction


Occupying a road that affects the safety and smoothness of road traffic, such as stacking objects, construction operations, opening up passages, setting up steps, gate slopes, advertisements, etc., shall be subject to the consent of the traffic management department of the public security organ.

The construction unit that has been approved to occupy the road for construction shall publicize it to the public in advance and comply with the following provisions:

(1) Carry out the construction within the approved road section and time;

(2) Barricades shall be set around the operation area. Lighting equipment shall be set and turned on on the barricade facilities at night, except for the setting of traffic signs, traffic facilities, and traffic markings.

(3) Construction signs or danger warning signs shall be set at a place not less than 50 meters away from the direction of incoming vehicles, At night, reflective construction signs or danger warning signs shall be set at a place not less than 100m away from the direction of incoming vehicles.

(4) Construction workers shall wear reflective clothing as required. When crossing the carriageway, they shall go straight through and pay attention to avoiding passing vehicles.

(5) After the construction operation is completed, the damaged road surface shall be repaired and the site remains shall be removed.


HowFor different pipes
ApplicationSewers
QTYAny

Quality Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg for sale
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0