Sign In | Join Free | My frbiz.com |
|
Categories | Cable Suspension Kit |
---|---|
Brand Name: | w-mate |
Model Number: | WR22080102 |
Certification: | SGS |
Place of Origin: | Dongguan,China |
MOQ: | 1000pcs |
Price: | Negotiation |
Payment Terms: | T/T, Western Union |
Supply Ability: | 100,000pcs/month |
Delivery Time: | 10-15Work Days |
Packaging Details: | PE bag +PP bag + carton (if you have other requirements, please contact us) |
Product name: | Steel Cable Hanging System |
Material: | Brass+Steel |
Cable Construction:: | 7x7 or 7x19 |
Application: | lighting,hanging |
MOQ: | 1000pcs |
Lead time: | 7 days if there were enough material in stock |
Sample: | Free Sample (Please contact our customer service) |
Company Info. |
Dongguan Wire Rope Mate HardWare Co,.Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Steel Cable Hanging System - Features:
Suspension Cable Kits have more than the advantages as below:
1. Time-Saving:Allows quick installation and instant adjustment;
2. Tool Free:Setting and Adjustable without utilizing tools;
3. Self-Locking:User Friendly and dismountable;
4. The finest way to suspend lighting fixtures available;
5. Low cost and competitively priced for use in industrial and
architectural lighting applications;
6. Made of Brass material with plated,rustless;
7. Compact design,easy taking and delivery.
8. Power Feed
Parameter:
Product Name | Cable Suspension Kit |
Material | Brass+Steel |
Cable diameter | 0.6~6mm |
Cable length | 30cm or as your request |
Straighten length | 100cm or as your request |
Detail | Thick and durable, fine surface treatment, simple appearance and convenient installation. |
Certification | ROSH |
Sample | Free Sample (Please contact our customer service) |
MOQ | 500pcs |
Steel Cable Hanging System - How to use?
OEM/ODM:
Our service:
FAQ:
What is the weight load?
How long can I expect to get the sample?
How long does the whole procedure being worked out?
After you place a order,the production handling time is about 10-
20 days.
We need 7 days to prepare all the stuff then 5 days for
manufacturing.
![]() |