Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Categories UV Cured CIPP
Brand Name: DAO
Model Number: D919
Place of Origin: Jiangsu, China
MOQ: 1 unit
Price: Variable
Payment Terms: T/T
Supply Ability: 20 units per month
Delivery Time: 20 working days
Packaging Details: Normal
Function: Large diameter sewer trenchless reha
Component: Blower, Cable, Video, Cure
Cable reel: 180 meters
Light: Mercury or LED
Diameter: DN650-1650
Color: Blank or printed
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Large diameter municipal sewer trenchless No-Dig rehab by CIPP UV technology

Preparation of UV curing construction instructions:


The drainage pipeline is gravity flow. The upstream (the front section in the downstream direction) and downstream (the rear section in the downstream direction) of the pipeline shall be determined in advance, so as to determine the sequence of repairing dragging materials.

If the site space allows, it is suggested to drag the bottom film and materials in the following order: starting from the upstream direction and dragging along the downstream direction.


1. pretreatment:

Ventilation, water stop, pumping, dredging, and cleaning. Ensure that there is no ponding, water leakage, foreign matter, serious deformation or dislocation, and other defects inside the pipeline.


2. robot CCTV inspection to determine whether it can be repaired


3. pull the bottom film with a robot: (use braided rope, do not replace the rope at will, otherwise the material or membrane will rotate in the pipe)

The connection buckle between the rope head and the bottom membrane shall be firmly fastened, and another rope for pulling materials shall be put on the upper end of the bottom membrane (if a winch is used, it shall be a steel wire rope). During the membrane pulling process, ensure that the materials and ropes are not mixed with the rotation of the bottom membrane.


For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.


UV Cure Trenchless Construction
Pipe diameterDN600-1200
Light sourceLED or Mercury is available
TemperatureTwo sensors for temperature monitoring
LegInterchanged as needed.
Other features are available to be custom-made.


Quality Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab for sale
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0