Sign In | Join Free | My frbiz.com |
|
Categories | Ejector Pins And Sleeves |
---|---|
Brand Name: | DATONG |
Model Number: | DT-006 |
Certification: | ISO 9001:2015 |
Place of Origin: | Dongguan P. R. China |
MOQ: | MOQ: 10 pcs |
Price: | 0.2-2 usd/pc |
Payment Terms: | T/T, Western Union, L/C |
Supply Ability: | 50000-60000 pcs per month |
Delivery Time: | 5-8 days |
Packaging Details: | Plastic bag (with anti-rust oil)+ forming film, PVC tube, plywood box etc according to the quantity. |
Material: | H13 /M2/SKD61/SKH51/SKD11/ WAS 1.2344/WS 1.2210 |
Surface treatment: | Through Hardened, TiN, TiCN, PVD DLC, Blackened, |
Hardness: | Through hardened and core hardness: HRC 40-45dness; |
Standard: | DIIN1530F, DIIN1530FH, DIN1530F-B, HASCO,MISUMI, PUNCH, AMERICAN INCH |
Customised service: | Available |
Product Name: | blade ejector pin |
PRODUCT DESCRIPTION
Flat Ejector Pin Ejector Blades For Plastic Mold Components DIIN1530FH, DIIN1530F DIN1530F-B
Standard: DIIN1530F, DIIN1530FH, DIN1530F-B, HASCO,MISUMI, PUNCH, AMERICAN INCH
Material:H13 (Hardened) /M2/SKD61/SKH51/SKD11/ 1.2344, High Speed Steel etc.
Treatment:Through Hardened, TiN, TiCN, PVD DLC, Blackened, Nitrided
Our Main Products
Plastic injection mold components, accessories:
Ejector pin series: ejector pin, stepped pin, core pin, insert pin, flat pin, shoulder pin etc.
Ejector sleeves
Punches,
Die casting mold components
CNC machinery parts
Autocar parts
Guide bushing & wear plate
Air poppet valves
Locating parts, taper interlock
Springs
Professional team, advanced equipments.
Our equipments:
Strict quality control:
Standard but solid package for shipment:
1.plastic bags.
2.cartons
3.Plywood cases, each container is clearly labelled before dispatch.
Port :Shenzhen port , Guangzhou port and another port in Guangdong province,China.
Delivery details : Normally shipped in 3-7 days after payment. Delivered by EMS,Fedex,DHL,TNT,ARAMEX or by sea.
Q&A:
How to get a quote? Send us the model or drawing you want.
How long is the delivery time? Standard parts in stock and 7-12 working days.
How can you ensure the quality? We have QC department to control the quality from the begining of production until goods finish
.
What is your terms of payment? Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
![]() |