Sign In | Join Free | My frbiz.com |
|
Categories | Butt Weld Fittings |
---|---|
Brand Name: | RT |
Model Number: | Pipe Fittings |
Certification: | CE,ISO,BV,SGS |
Place of Origin: | Hebei,China |
MOQ: | 1ton |
Price: | To be Negotiable |
Payment Terms: | T/T, L/C |
Supply Ability: | 400tons/per month |
Delivery Time: | 35 working days |
Packaging Details: | By Wooden Case or Pallets or as customer's request |
Standard: | ASME/ANSI B16.9 B16.48 B16.25,JIS,DIN |
Size: | 1/2''-48'' |
Thickness: | STD SCH40 XS SCH80 |
Material: | A234WPB Q235 P245GH |
Head Code: | Round |
Surface: | Black paint or Sandblast |
Cert: | ISO9001,ISO14001,ISO45001 |
Usage: | Construction Industry/Chemical Industry/Petroleum Field/Nuclear Energy |
High Quality Black Butt Weld Fittings 45 Degree Carbon Steel Elbow Fittings
Description:
Carbon Steel Buttweld Seamless Pipe Fittings are the most frequently used pipe fittings. such as Carbon Steel Buttweld elbow, Buttweld Carbon Steel cross, Buttweld Carbon Steel tee, Buttweld Carbon End Pipe Cap, Carbon Steel Buttweld stub ends, CS reducer, etc
Specifications:
Product name | Carbon steel elbow fittings |
Standard | ANSI B16.9/JIS/DIN/EN10253 |
Product Material | ASTM A234WPB/A420WPL6/P235GH etc |
Size | 1/2''-48''(DN15-DN1200) |
Thickness | SCH10-XXS/SGP |
Connection Mode | Butt Welding |
Fittings End | Beveled |
Application | Jointing pipe lines |
Delivery time | about 35 working days after received payment |
Advantage | High Preservative;Heat Resisting;Super Toughness |
Packing | Free Fumigation Wooden Cases/Pallets |
FAQ:
1.)Are you a trading company or Factory?
We are a real factory with our own producing machine and
warehouse,started to do business from year 1993
2.)How long time of your longer cooperation customer?
Many customers have long cooperation with us,such as European
customer cooperated with us 15years.and more.
3.)What is your advantage?
Best quality,low price,special service,each customer information
record.
4.)What about your delivery time?
quantity less than 500tons,25days after get deposit,above 500tons
will need 30-35 working days.
![]() |