Sign In | Join Free | My frbiz.com |
|
Categories | Flying Saw Cutter |
---|---|
Brand Name: | JCCS |
Model Number: | JCCS-76-144 |
Place of Origin: | HeBei China |
MOQ: | 1 set of |
Price: | Negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 20 Set/Sets per Month |
Delivery Time: | 15-30 work days |
Packaging Details: | Usually a high quality steel square tube making machine is loaded in a container. Depends on the size and weight of the machine. |
Product name: | Cold Cutting Saw |
Origin: | HeBei China |
Applicable industries: | Building material stores, manufacturing plants, mechanical repair shops, construction works, energy and mining |
Core components: | PLC, bearing, gear |
Speed: | Custom made |
Cutting method:: | Cold cut |
Use:: | Cut |
Main selling point: | Remote control |
Steel pipe welding production machine Automatic friction cold cutting saw or CNC friction flying saw
Introduction
The material can be cut to a preset length with high precision, and
the cutting cycle is short. The fly-cut carriage system accelerates
to match the tube mill speed and maintains that speed during the
cutting process. After cutting, it reverses direction in
acceleration mode until it returns to its original position,
waiting for the next working cycle.
Material | Q195 Q235 SPCC | |
Production speed | 80m/min(length 6 meter,dia.≤25mm) | |
Feeding direction | ||
Operation height | 800mm | |
Cutting burr height | Max:0.25mm; | |
Power supply | AC380V,3PH,50HZ |
Features
1. Low noise, good production environment
2. Low spindle speed and high safety factor
3. Strong incision flatness, no burrs, no need for flat heads
4. CNC cutting, high cutting efficiency and low loss
Our service
1. Professional pre-sales consultation and after-sales service to
help you find the best solution
2. Discuss technical details with our professional engineers
3. Strictly control the quality and production plan of the cold
flying saw. You will be kept informed of any progress
4. Check the cold flying saw before shipment
5. After the warranty period, spare parts are provided at cost
6. Professional engineers help you increase production, reduce
waste and reduce costs
7. Control the production progress and quality of the machine, and
provide you with detailed information in time
![]() |