Sign In | Join Free | My frbiz.com |
|
Categories | Mechanized Bridge |
---|---|
Brand Name: | Harzone |
Place of Origin: | China |
MOQ: | negotiation |
Payment Terms: | According to detailed order |
Delivery Time: | negotiation |
Packaging Details: | According to detailed order |
Material: | steel |
Feature: | large span |
Capacity: | Heavy loading capacity |
Status: | Sefl Fold and Unfold |
Product name: | Tracked Load LD-60 Emergency Bridge Mechanized Bridge |
Condition: | New |
Warranty: | 1 Year |
Application: | emergency bridges |
Span: | 17-51m |
Company Info. |
CHINA HARZONE INDUSTRY CORP.,LTD. |
Verified Supplier |
View Contact Details |
Product List |
Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge
Description of Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge :
Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
Technical data of Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge:
Curb weight of erection vehicle (including 3 men): 33t
Curb weight of transportation vehicle: 21t
Dimensions of erection vehicle (length×width×height):13600mm×3200mm×3470mm
Dimensions of transportation vehicle (length×width×height):12000mm×3400mm×3500mm
Design loading: tracked loading 60t
Wheeled (load on axle) 13t
Max. tracked loading: ≤ 15km/h
Max. wheeled loading: ≤ 30km/h
Design using longevity (loading across) 10000 times
Erection length : 17m,25.5m,34 m,42.5 m,51 m
Erection width: 4m
Negotiating depth: ±3m
Erection maximum longitudinal gradient: 10 %
Erection maximum transverse gradient : 5%
Erection time (complete bridge) 90min
Retrieval time (complete bridge) 90min
Operator: 3~4 men (not including drivers of transportation vehicles)
Ambient temperature: -41℃~+50℃
Max. speed: 80km/h
Min. turning dia: 24m
Min. ground clearance: 300mm
Max. fording depth: 700mm
Max. gradeability: 60%
Max. continued mileage: 650km
Main features of Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge:
1Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)
2 Large single span: max. single span reaches 51m
3 Less composition unit: one erection vehicle, six transportation vehicle
4 Fast erection: 90min (To erect a 51m bridge)
5 High mechanization level, low labor intensity: using remote control operation
6 Less operators: 3-4(not including drivers)
Max. Tracked Loading:≤ 15km/H 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four
decades, the leaders of both the Party and nation have been caring
for the growth of the company. Chairman Mao underlined the
documents for the factory establishment. Later, ZhangAiping., one
General, and Chen Shiju, one commander, inscribed name for the
company. In 2008, Mr. He Guoqiang, Standing Committee of Political
Bureau of CPC Central Committee, Secrrtary of the Discipline
Inspection Commission of CPC Central Committee had paid a visit to
the company and inspected the workshop and saw the erection of the
mechanized bridge, who also encouraged the company to develope
well.
Righe now, the company has one research center in Wuhan, which is
the national degree, one trading center in Beijing, one
manufactuing center in Chibi, three offices in Gana, Ethiopia and
Peru.
Harzone Industry has enjoyed a proud history, it must also create a bridge future.
![]() |