Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home >

Faucet Production Process By Low Pressure Die Casting Machine

Faucet Production Process By Low Pressure Die Casting Machine
Categories Faucet Prodution Line Solution
Brand Name: DZ
Certification: CE ISO
Place of Origin: CHINA
MOQ: 1
Payment Terms: L/C, T/T, Western Union
Supply Ability: 1 sets/month
Delivery Time: 30days
Packaging Details: Packing in wooden cases suitable for sea transportation
Channel induction furnace: 1 Inductor with two channels in W-shape
Furnace Capacity: 2800KG
Melting capacity: 700 KG/H
Inductors: 2*80 KW
Max. Speed of Manipulator (S): 35° / s
Total Weight: 24T
Total Power: 180KW
Operating Voltage: 380V
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Faucet Production Process By Low Pressure Die Casting Machine

Faucet production process consists of four parts,casting,mechanical processing,surface treatment,and assembly.

  1. Casting process
  1. Product design
  2. Mould design and manufacturing
  3. Mould tidy up
  4. Mix sand
  5. Sand core shooter
  6. Low pressure die casting machine
  7. Short blasting cleaning out the sand core
  8. Sawing cutting



2.Machining


get the brass casting after annealing, using CNC numerically-controlled machine tool and other machine tool to process the brass casting,to make it’s dimensional,accuracy,and position meet drawing requirements.


Proceed polish,take outrags,rough surface and potholes on surface,make the product surface have no obvious sand holes and hole defect after completion of machining. Grinding polishing processing, after polishing,use high-speed rotating wheel to grinding workpiece surfaces, make it smooth and bright, increase the brightness of product surface.


3.Surface treatment.

Surface treatment technology mainly include PVD (Physical Vapor Deposition), ORB (Oil Rubber Bronze),electroplating plating etc., most widely used is electrochromism.Electroplate can enhance corrosion resistance of faucet, increasing hardness, prevent abrasion, surface beauty. Most common is hexavalent chromium electroplating,now green trivalent chromium plating is rising. Electroplating can be divided into three layers,first layer acid copper plating,second nickel plating and three chrome plated. International standard of faucet electroplating thickness is 8 microns, the best can reach 12 micron.


Plating surface treatment can be used 24 hours acetic acid salt spray test to judge quality, and can use layer thickness meter to authenticate each metal coating thickness.Usually if coating thickness can reach standard,salt spray test can pass. Electroplating is big pollution and big energy consumption,general faucet factory have to send faucets to professional electroplating factory to plating, thereby increasing production time and difficulty of control.


For direct drinking water faucet, need lead washing treatment after plating processing,get rid of the lead on faucet surface. After secondary water washing,chemical degreasing, de-lead by alkaline and acid, make our products conform to the American NSF61,lead content under 8 ‰, make product more conducive to human health. (2015 AB1953 regulation is more strict).


Quality Faucet Production Process By Low Pressure Die Casting Machine for sale
Send your message to this supplier
 
*From:
*To: Xiamen DingZhu Intelligent Equipment Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0