Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home >

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

Categories Turgo Impulse Turbine
Brand Name: Wawushan
Model Number: SF-018
Place of Origin: China
MOQ: 1
Price: negotiable
Payment Terms: T/T
Supply Ability: 1+unit+4 months
Delivery Time: 180 wordking days
Packaging Details: plywood
shaft: forged steel
layout: vertical
insulation class: F/F
excitation: brushless
voltage: 400v
capacity: 4000kw
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

4000kw Hydroelectric Electricity For Micro Hydro Power Plant


overview

Hydro turbine generator is droved directly or indirectly by hydro turbine. The rotating speed is less than 1500r/min, with horizontal and vertical arrangement. Excitation mode with brushless and static silicon type.

Components including stator, rotor,base frame, bearing, excitation motor or collecting ring. The outlet voltage from 400V to 13.8KV, and frequency could be 50Hz or 60Hz, output from 50Kw to 50Mw. Our generator are high efficiency, reliable, manufacture and tests all follow related IEC standards.

Hydro-generating unit is the key power equipment in the hydropower plant.

The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro-turbine runner. two different mount for generator of vertical and horizontal which could be operated at brushless excitation and thyristor excitation. the hydro generator has usually used air as medium to cool its stator, rotor winding and iron core.

A hydraulic turbine converts the energy of flowing water into mechanical energy. A hydroelectric generator converts this mechanical energy into electricity. The operation of a generator is based on the principles discovered by Faraday. He found that when a magnet is moved past a conductor, it causes electricity to flow. In a large generator, electromagnets are made by circulating direct current through loops of wire wound around stacks of magnetic steel laminations. These are called field poles, and are mounted on the perimeter of the rotor. The rotor is attached to the turbine shaft, and rotates at a fixed speed. When the rotor turns, it causes the field poles (the electromagnets) to move past the conductors mounted in the stator. This, in turn, causes electricity to flow and a voltage to develop at the generator output terminals."


Specification


Name4000kw Hydroelectric Electricity
Capacity24000KW
Frequency50HZ
Generator Voltage6300V
Layout patternhorizontal
Material(coil)copper
ExcitationBrushless
Generator InsulationF/F
Lifespan60 years

our service package for power plant


1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(


Quality 4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine for sale
Send your message to this supplier
 
*From:
*To: Hongya Power Generating Equipment To Utilities Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0