Sign In | Join Free | My frbiz.com |
|
Categories | Square Rectangular Tube |
---|---|
Place of Origin: | Shandong, China |
Brand Name: | Yuantai Derun |
Model Number: | 405,409l,410l,210,301,314,316,304l,306l |
Packaging Details: | PVC bag cloth with cable tie or as requirements. |
Supply Ability: | 5000 Ton/Tons per Month |
Price: | $1,800.00 - $2,200.00/Tons |
Certification: | ISO |
MOQ: | 1 Ton |
Payment Terms: | L/C T/T (30% Deposit) |
Delivery Time: | 8-14 days |
Standard: | JIS |
Type: | Welded |
Steel Grade: | 400 Series, 301, 410, 316L, 321, 410L, 430, 304, 409L, 304L, 405, 444 |
Application: | Construcion, Building , Industry |
Welding Line Type: | ERW |
Tolerance: | ±1% |
Processing Service: | Bending, Welding, Decoiling, Punching, Cutting, Moulding |
Grade: | 400 Series, 201/202/304 /304L/316/316L321/310s/410/420/430/440/439ect |
Section Shape: | Square |
Alloy Or Not: | Non-Alloy |
Surface Finish: | 2B |
Invoicing: | by theoretical weight |
Product name: | Stainless Steel Square Pipe |
Material: | ASTM A312/304/304L/304H/316/316L/317/321/310/904L |
Technique: | Cold Rolled Hot Rolled |
Surface: | BA/2B/NO.1/NO.3/NO.4/8K/HL/2D/1D |
Port: | QingDao,ShangHai,TianJin |
Carbon steel pipe is made from solid tube ingot or the perforation
capillary, then through hot rolling and cold rolling or cold dial.
Carbon steel pipe has an important position in the steel industry
in our country.
Name | stainless steel square tube for sale |
Supply Capacity | 120 tons/month |
Process Method | cold drawn and cold rolled |
Wall Thickness | 1.5-10mm |
Length | 11.8 meters |
Steel Grade | 200 (Ni : 0.8%), 201B (Ni : 3%), 201H (Ni : 5%) |
301 (Ni : 6%), 304, TP304, TP304L/304L, 321, TP321, 316, TP316L,
316L, 316Ti | |
317, 317L, 309S, 310S(2520), 347, Duplex 2205, Duplex 2207, etc. | |
Standards | ASTM / ASME, GB, DIN, JIS, T14975, etc. |
Specification | O.D: 1/4" - 32" (inch) |
W.T: SCH5S, SCH10S,SCH40S,SCH80S,SCH160S,etc. | |
Or non-regular size to be tailored as required. | |
Application | Construcion/Building /Industry |
Packing | 1.with plastic cap to protect both ends |
2.plastic bag wrapped outside the pipe | |
3.bundles to be covered by polythene & strapped securely . | |
4.if require ,then pack into wooden box. | |
Certificate | ISO 9001:2008 |
Delivery time | 30-60 days depend on Quantity |
Payment Term | T/T, Irrevocable L/C at sight |
Trade Term | FOB , CFR , CIF |
![]() |