aillable Material | 1. Stainless Steel: SS201, SS202,SS302,SS303, SS304, SS316, SS410,
SS420,SS430,etc. |
|
2, Steel:C45(K1045), C46(K1046),C20,etc. |
3. Brass or brass
alloy:H63(CuZn37,C2720);H65(CuZn36,C2700);H68(CuZn33); |
H70(CuZn30,C2600);H90(CuZn10,C2200),etc |
4. Bronze: C51000, C52100, C54400, etc. |
5. Iron: 1213, 12L14,1215,etc. |
6. Aluminum or aluminum alloy: Al6061, Al6063, etc. |
7, Carbon steel :
C1006,C1008,C1010,C1016A,C1018A,C1022,C1035K,C1045K,etc. |
8, Titanium and Titanium alloy : TAD,TA1-TA8,TB2,TC1-TC10,etc. |
9, Silver and Silver
alloy:AgCu3,AgCu7.5,AgSn3~5,AgPb0.4~0.7,AgPd3~5,AgNi10,etc. |
10, Alloy steel : SCM435,10B21,40Cr,etc. |
Specification | M0.8-M12 or 0#-1/2" and we also produce according to customer's
requirement |
Surface Finishing | Zn- Plated,Ni-plated,Passivated,Tin-plated,Sandblast and Anodize, |
|
Chromate, Polish,Electro Painting,furnace Black, Black
Anodize,Plain,Chrome plated, |
Hot Deep Galvanize(H. D. G. ) etc. |
Heat treatment | Tempering,Carburized,Spheroidizing,Stress Relieving. |
Standard | ISO,,DIN,JIS,ANSI/ASME,BS/Q |
Manufacture Process | Heading/washer assembly/Threading/Secondary machine/heat
treatment/plating/Anti-slipping/Baking/QA/Package/Shipping |
Sample Availablity | we can send samples to you within 5 days if it is available, if we
don't have models, we can send samples within 15 working days after receiving the
tooling charge in advance.Sample shipping charge is collected. |
|
Lead time | 10-15 working days as usual,It will based on the detailed order
quantity. |
Carton Size | 28.5*20*12 CM |
Pallet Size | 110*100*90 CM or As Customer's size |