Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Metal Building Materials >

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement

Categories Concrete Steel Fiber
Brand Name: Yusen
Model Number: YS-50/30
Certification: ISO CE
Place of Origin: China
MOQ: 1T
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 2000T/m
Delivery Time: 10Days
Packaging Details: Pallet
Product name: Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement
Material: Q235
TS: 1215Mpa
Color: Grey and bright
Applicant: Concrete support
Diameter: 0.6mm
Standard: ASTM 820 / CE
Style: Morden
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement

Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement



Concrete Steel Fiber introduction

Concrete steel fiber is manufactured by high quality wire rod with 6.5mm, which has excellent mechanical properties including high tensile strength. Hence, the average tensile strength of the reinforced fibre surpasses 1350MPa. Due to this high strength,the uniform distribution of fibers, stresses can be fully dispersed and cracking be effectively controlled.


Refers to loose steel fiber and glued steel fiber.the big difference between loose and glued fibers is that the former is easy to block together and the latter is easy to disperse uniformly.

Specification of Concrete Steel Fiber

Hooked Ends
Steel Fiber
ModelDiameter (mm)Length (mm)Aspect ratio (mm)Tensile strength (MPa)
YS-60/6016060≥1000
YS-50/5015050≥1000
YS-65/600.96065≥1000
YS-55/500.95055≥1000
YS-80/600.756080≥1000
YS-45/350.753545≥1000
YS-50/300.63050≥1100
YS-55/300.553055≥1100
YS-65/350.533565≥1100
YS-60/300.53060≥1100
YS-50/250.52550≥1100
YS-60/250.42560≥1100


Application:

  1. Shotcrete, tunnel linings.
  2. Mass concrete composite deck construction.
  3. Precast concrete.
  4. Industrial slabs on ground
  5. High-speed railway
  6. Hydro power station
  7. Military project
  8. Aircraft runway

Dosing and mixing

  • Introduce fibers with sand and aggregates.
  • Add fibers to fresh concrete
  • Mixing it with mixtures for 1-2 minutes and then water to stir

Products and delivery







Quality Endhooked Concrete Steel Fiber in Hydro Power Station for Reinforcement for sale
Send your message to this supplier
 
*From:
*To: Hebei Yusen Metal Wire Mesh Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0