Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home >

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

Categories Excavator Mounted Pile Driver
Brand Name: VIBRA
Model Number: FV-350L
Place of Origin: SHANGHAI
MOQ: 1 set
Price: Negotiation
Payment Terms: L/C, T/T, D/P
Supply Ability: 15 set/month
Delivery Time: 7-35 days
Packaging Details: 7.616 CBM
Name: Excavator Mounted Pile Driver
Feature: High Precision
Vibration Frequency: 3200rpm
Operation Pressure: 32Mpa
Hammer Weight: 2400kg
Arm Weight: 670kg
Centrifugal Force: 435Kn
Excavator: 35~40 ton
Piling Length: !5m
HS Code: 8430100000
Color: Blue/Yellow, customized color available
Material: Steel, Core materials are all imported
Type: New and Used both available
Inner Parts: Imported from American and European Countries
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length

Application


  • Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
  • Quick converting operation; Applied to various working environments.
  • Compared to other systems, less force required for pile pulling
  • Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
  • Not damage the building even often work near it.
  • Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short; It is helpful to overcome environmental problems.
  • According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.


Features


VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.



Technical Parameter


ItemFV-250FV-280FV-300FV-330FV-350LFV-350FV-400
Vibration Frequency (rpm)2500280032003200320032003200
Operation Pressure (Mpa)30323232323232
Centrifugal Force (KN)265335350372435455485
Max.Pile Length (m)10121212151518
Arm Weight (kg)500500670670670750750
Hammer Weight (kg)1700190021002300240026002700
Excavator (T)20-3020-3030-3533-4035-4040-4545-60

About Us


Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.


After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.


Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.


FAQ


Q: How long is the warranty period ?


A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.


Q: What is the MOQ ?


A: 1 set is available.


Q: What's the payment method ?


A: We accept T/T and D/P payment.


Q: What is the delivery time ?


A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.


Q: Can I have our LOGO on the machine ?


A: Of course you can.


Q: How is your product quality ?


A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".


Q: Can I be your dealer ?


A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

Quality Coastal Areas Project Work Excavator Mounted Pile Driver 18M Length for sale
Send your message to this supplier
 
*From:
*To: Shanghai Yekun Construction Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0