Sign In | Join Free | My frbiz.com |
|
Categories | Perimeter Safety Screens |
---|---|
Brand Name: | Aoben |
Model Number: | Aoben-Safety Mesh-04 |
Certification: | ISO9001 |
Place of Origin: | China |
MOQ: | 200set |
Price: | Negotiate |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 10000/set per day |
Delivery Time: | 10-25days |
Packaging Details: | steel pallet |
Material: | Galvanzied steel plate,steel plate |
Type: | Frame mesh |
Technique: | Perforated |
Hole Size: | Round |
Plate thickness: | 0.4-0.8mm |
Thickness of tube: | 0.7-1.2mm |
Surface Treatment: | Powder coating or galvanized |
Application: | Protection system screen |
New Type Scaffolding System Protection Perimeter Safety Screens
Steel safety screens for scaffolding system,Protection mesh for building construction system,Self - climbing saftey screens.
Perimeter safety screen is a new type of scaffolding system, applied to a variety of design types of high-rise and super high-rise building construction, appearance of the same high-rise buildings construction protection; Suitable for the construction of cast-in-place shear wall, frame, arc balcony, slab and other complex shapes.
The advantages of perimeter safety screens:
1, save material: only build 4~5 times the height of the floor, greatly reduce the use of scaffolding;
2, save labor: no need to reverse material, lifting and lifting fully automatic;
3, strong independence: rely on their own equipment lift, do not occupy vertical transport equipment;
4, shorten the construction period: avoid repeated construction, semi-small automatic promotion in place;
5, the protection in place: the height of the new climbing network conforms to the construction scope of the mold binding bar and the mold removal support;
6, safe and reliable: low assembly, low removal, anti tilt anti fall equipment is complete, lifting operation frame body;
7, management norms: high degree of equipment, can be managed according to the equipment, according to the bearing position fixed law, easy to check;
8, professional operation: including machinery, electrical appliances, lifting equipment, operators must be professional training;
9, the whole process: from the bottom to the completion of three-dimensional engineering construction, from the top to the bottom to complete the exterior wall decoration project;
10, civilized construction: targeted design, professional construction, management norms.
![]() |