Sign In | Join Free | My frbiz.com |
|
Categories | Pneumatic Drilling Rig |
---|---|
Brand Name: | ShiTan |
Model Number: | ST-450 |
Certification: | ISO9001 |
Place of Origin: | China |
MOQ: | Negotiation |
Price: | Negotiation |
Payment Terms: | L/C, D/A, T/T, Western Union |
Supply Ability: | 1000year |
Delivery Time: | Within 7-12 days |
Packaging Details: | Naked |
Type: | crawler hydraulic reverse circulation drilling rig Crawler Mounted Drill Rig |
Power Type: | Diesel |
Driving way: | Hydraulic driving |
Usage: | Geological core drilling |
Weight:: | 9.8T |
Voltage: | 380V |
Air pressure: | 1.25-3.5Mpa |
Drilling efficiency: | 10-35m/h |
Weight of the rig: | 4m×1.7m×2.2m |
Power(w): | 92kW |
Name: | 200m pneumatic tractor mounted water well drilling rig machine price |
Color: | blue,Yellow |
Company Info. |
Jinzhou City Shitan Machinery Equipment CO. LTD. |
Verified Supplier |
View Contact Details |
Product List |
Supply 400 Depth Crawler Pneumatic Water Well Drilling Pneumatic Water Well Drilling
Introduction of 450 crawler type water well drilling rig
It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexibility and efficiency
Product parameters:
The Weight(T) | 6T |
Dimensions(mm) | 4m×1.7m×2.2m |
The hole diameter(mm) | 105-260mmmm |
Drilling Depth(m) | 260meters |
Once-time advance length(mm) | 3000/6000mm |
Walking speed(Km/h) | 2.5KM/H |
Climbing angles(Max.) | 30 |
Minimum clearance clearance(mm) | 230 |
Using air pressure(Mpa) | 1.25-3.5 |
Air consumption(m³/min) | 23 |
Equipped capacitor(Kw) | 92 |
Swing speed(rpm) | 55-115 |
Swing torque(N.m) | 5900 |
Drill pipe diameter(mm) | Φ76 Φ89 Φ102 |
Drill pipe length(m) | 1.5 2.0 3.0 6.0 |
Rig lifting force(T) | 30 |
Several aspects needing attention in the process of preparation and use:
1. Before underground construction and installation of water well
drilling rig, please clean the drilling site and maintain
sufficient building space and good ventilation. There shall be long
enough water source, power supply and water supply hose.
2. The main function of water well drilling rig column is to
support and fix the drilling rig. After selecting the drilling
position, first support the chromatographic column, support the top
plate assembly of the chromatographic column on the top of the
tunnel, adjust the screw to support it, and then tighten the nut to
lock and fix the chromatographic column.
3. Fix the frame to the column according to the height and
inclination of the hole. By adjusting the bolts, the frame can be
installed to the appropriate height and the frame can be adjusted
to the appropriate tilt angle.
4. Turn on the power and check whether the direction of the spindle
is consistent with the direction of the arrow on the gearbox. Then
rotate the hand wheel to neutral, run it for 5 minutes under no
load, and then rotate the hand wheel to the forward position, and
the main engine shall move forward no less than three times. The
drilling rig shall have no abnormal sound and move flexibly on the
frame.
5. Install the drill pipe and drill bit of the well drilling rig,
connect the water source and power supply, and align the hole. When
opening the hole, first rotate the hand wheel slowly forward,
gently connect the clutch, and then tighten the clutch when the
drill bit body is fully drilled into the hole, but the force shall
not be too large. When drilling to the required depth, please
quickly turn the hand wheel in the opposite direction to stop the
progress. Then tighten the hand wheel backward and the main engine
will retract quickly. When the drill bit completely exits the hole,
it will stop again. Otherwise, the drill bit and parts will be
damaged. At this time, the handwheel will rotate to the neutral
position.
How to maintain well drilling rig
Pay attention to check the lubricating oil of the wind motor at any time, and check whether the bolts and nuts of the water and gas pipeline and various accessories of the drilling rig are firm at any time. When the working face is immersed in water, use a large-diameter drill bit to insert the drill pipe when opening the hole, so that the drill pipe is 1-2m above the water surface, so as to prevent mud and rock slag from falling into the hole, During the drilling operation, the water well drilling rig is not allowed to reverse to prevent the drill pipe from falling into the hole. When the water well drilling rig stops working in a short time, a small amount of air pressure shall be given to prevent sediment from immersing into the impactor of the drilling rig. If the drilling rig stops working for a long time, the sound of the impactor and the operation of the reducer shall be checked. If abnormal sounds and phenomena are found, it shall be shut down immediately and checked in time.
![]() |