Sign In | Join Free | My frbiz.com |
|
Categories | Power Transformer Bushings |
---|---|
Brand Name: | YC |
Model Number: | BFP-1KV/1000-2500A |
Certification: | ISO 9001, ISO 14001, OHSAS 18001 |
Place of Origin: | Hebei, China |
MOQ: | 1 piece |
Price: | negotiate |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 10000pcs/month |
Delivery Time: | 3-10 work days |
Packaging Details: | Standard package |
Name: | ANSI American Standard Casing Transformer Bushing |
Product specification: | Brass components for LV & HV transformer |
Dimensions: | Customer required |
Sample: | Approved |
Tensile Strength: | Construction |
Material: | Brass, stainless steel, copper, aluminium, or contact us if your required material is not list above |
Color: | White, Brown or Customized |
Phase: | Three |
Company Info. |
Hebei Yachen Electric Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
NJREC bushings are electrical bushings designed in accordance with EN 50180 (old DIN 42531-2-3-4), EN 50243 (old DIN 42541), EN 50386 and DIN 42537 standards; characteristics and tests for this kind of insulated bushings are according IEC 60137.
Features
Name | ANSI American Standard Casing Transformer Bushing |
Model | ANSI EN DIN GB standard |
Type | Insulator |
Tensile Strength | Excellent |
Condition | Power transformer and distribution transformer |
Professional | We are profession in producing transformer bushings more than 20 years. |
Process | Investment casting |
Dimensions | We provide customized size & follow clients idea and design |
Color | White, brown or customized |
Note | Please let’s know the size, quality, material, grade or target price if it is special nonstandard products and send the drawing and samples to us. |
Our services
1. Free sample supply
2. Factory direct price
3. Timely delivery guaranteed
Property
Excellent appearance and glazing, smooth at surface with very few defect.
FAQ
Q1: What is your MOQ?
A: Our MOQ is 1 piece.
Q2: Do you offer sample?
A: Yes, we can provide you a sample.
Q3: What is your payment term?
A: 100% TT in advance.
Q4: What is your lead time?
A: 3-10 work days after order confirmed. Urgent need please discuss with us to find a way out!
Q5: Are you a manufacturer or a trader?
A: We are a manufacturer and all the items mentioned are made by ourselves. We have our own sales team to provide you the best export service too.
Q6: Can you make the packing and logo as customer request?
A: Yes we can.
![]() |