Sign In | Join Free | My frbiz.com |
|
Categories | Seamless Steel Tube |
---|---|
Brand Name: | Torich |
Model Number: | EN10305 |
Place of Origin: | zhejiang, China |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Delivery Time: | 30-45days |
Packaging Details: | In hexagonal bundles or wooden box |
Model No: | EN10305 |
Technique: | Cold Drawn |
Surface Treatment: | Oiled |
Section Shape: | Round |
Secondary Or Not: | Non-secondary |
Type: | Seamless Steel Pipe |
Usage: | Hydraulic Pipe |
Length: | According To Customers Requirement |
Company Info. |
TORICH INTERNATIONAL LIMITED |
Verified Supplier |
View Contact Details |
Product List |
Hydraulic Cylinder Tube E355 ST52 H8 Honed Tube
Manufacture Method:
Cold drawn, hot rolled+deep hole bored
Certification:
ISO9001, SGS,
Material:
Carbon steel,alloy steel, stainless steel
Standard&Grade:
DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.
Size Range:
ID of 300mm max for cold drawing,
ID of 500mm for deep hole boring
ID Tolerance:
ISO H8
End finish:
Plain ends with square cuts,free of burrs
Bore Roughness:
Ra0.30um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes
End finish:
Plain ends with square cuts,free of burrs
Usage:
Hydraulic cylinder, Pneumatic Cylinder
Product Feature:
1.High precision (can cut the costs of machining) .
2.Excellent surface finish
3.Good mechanical performance (Aneal ,Bright Anealing,QT heatment
on steel tubes to reach customers' Mechanical requsts. )
1.+C /BK
No heat treatment after final cold drawing process.
2.+LC/BKW
After the final heat treatment there's a suitable drawing pass.
3.+SA/BKS
After the final cold drawing process there's a stress relief heat treatment in controlled atmosphere.
4.+A/GBK
After the cold drawing process the tubes are annealed in a controlled atmosphere.
5.+N/NBK
After the final cold drawing operation the tubes are normalized in a controlled atmosphere.
Product Pictures
Company Introduction
QUALITY CONTROL
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring
Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a
perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate
longitudinal and transversal defects
![]() |