Sign In | Join Free | My frbiz.com |
|
Categories | Hydraulic Piling Rig |
---|---|
Brand Name: | SINOVO |
Model Number: | TR230D |
Certification: | CE/GOST/ISO9001 |
Place of Origin: | China |
MOQ: | 1 set |
Price: | Negotiation |
Payment Terms: | L/C, D/A, D/P, T/T |
Supply Ability: | 30 set per month |
Delivery Time: | 7-10 work days |
Packaging Details: | International Export Carton Case Package |
Name: | Crawler Piling Rig |
Model: | TR230D |
Max drilling depth: | 68m |
Drilling diameter: | 2000mm |
Max drilling torque: | 246KN.m |
Rated power: | 232KW |
Track shoe width: | 800mm |
Total weight: | 76.8T |
Company Info. |
Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd. |
Verified Supplier |
View Contact Details |
Product List |
68m Depth 2200mm Diameter TR230D Crawler Hydraulic Piling Rig
TR230D rotary dilling rig is specially designed to suit the following applications:
1. Dilling with telescopic friction or interlocking kelly bar -
standard supply;
2. Dilling cased bore piles ( casing driven by rotary head or
optionally by casing osillator);
3. CFA Piles by means of continue auger;
4. Either crowd winch system or hydraulic crowd cylinder system;
5. Displacement piles;
6. Soil -mixing;
Technical Parameters:
Max drilling depth | 68m |
Max hole diameter | 2000mm |
Engine model | SCANIA DC09 |
Rated power | 232KW |
Max torque | 246kN.m |
Rotating speed | 6~32rpm |
Max crowd force of cylinder | 215kN |
Max extraction force of cylinder | 230kN |
Max stroke of crowd cylinder | 6000mm |
Max pulling force of main winch | 240kN |
Max pulling speed of main winch | 65m/min |
Wire line of main winch | Φ28mm |
Max pulling force of auxiliary winch | 100kN |
Track shoe width | 800mm |
Whole machine weight (with kelly bar) | 76.8T |
MAIN FEATURES:
1. Retractable original CAT 336D chassis with EFI turbocharged
engine ensures the stability of the whole machine meet the
performance on various applications and construction environment.
2. Advanced main pump adopted negative flow constant power variable
automatic control, which can realize the optimal matching in the
load and the output power of engine.
3. The large torque rotary head adopts three level anti shocking
technology to effectively absorb the impact of kelly bar. Equipped
REXROTH or LINDE motor provides powerful output torque and realizes
grading control according to the geological conditions,
construction requirements and so on.
4. High speed spin off is optional, centrifugal force is increased
which can achieve fast soil unloading, increase construction
efficiency remarkably.
5. Electric systems are from Pal-Fin auto-control, optimal design
of electric control system improves the control accuracy and the
feed back speed.
6.Equipped advanced automatic switch of manual control and auto
control, the electronic leveling device can monitor and adjust the
mast
automatically, and guarantee a verticality condition during
operation.
7. The newest desinged winch drum structure is to advoid steel wire
rope tangling and effectively prolongs the wire's service life.
8. The main winch has functions of touch- -bottom protection and
priority control; fast speed kelly fall is optional.
9. Low vibration,low noise and low pollution to meet the high
standards of city pile foundation construction.
STANDARD EQUIPMENT:
1. Working speed Rotary head as standard configuration type ( High
speed rotary head as optional)
2. Winch controlled free-fall type
3. Main and auxiliary winch with special grooving
4. Hoist limit switch on main and auxiliary winches
5. Swivel for main rope
6. Pivoted anchor points for main rope
MEASURING AND CONTROL EQUIPMENT:
1. PLC control system, colorful LCD display
2. Display of fault messages as plain text
3. Mast inclination measurement on XY axes( digital/analog display)
4. Automatic vertical alignment of mast
5. Depth measuring device on main winch
Quantity(Pieces) | 1 - 1 | >1 |
Est. Time(days) | 20 | To be negotiated |
FAQ
Q1.What is the main function of our mining drilling machine?
Ans.: It has different models used for all kinds of working site.
Q2. What is your terms of payment?
Ans.: T/T 30% as deposit, and 70% before delivery. We'll show you
the photos of the products and
packages before you pay the balance.
Q3. What is your terms of delivery?
Ans.: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
Ans.: Generally, it will take 7 -10 working days after receiving
your advance payment. The specific delivery time depends on the
items and the quantity of your order.
![]() |