Sign In | Join Free | My frbiz.com |
|
Categories | Nickel Alloy Tube |
---|---|
Brand Name: | TORICH |
Model Number: | UNS N08825 |
Certification: | ISO9001; ISO14001; TSI16949 |
Place of Origin: | ZheJiang,CHINA |
MOQ: | 5 Tons |
Price: | negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 60000 Ton per year |
Delivery Time: | 30-35 days |
Packaging Details: | packing in wooden boxes or in hexagonal bundles |
Product Name: | ASTM B423 Incoloy 825 UNS N08825 Nickel alloy seamless pipe / tube |
Keyword: | Nickel Alloy steel tube |
Standard: | UNS N08825 |
Application: | Manufacturing, The steam turbine,Cryogenic |
Alloy or not: | Alloy |
Technique: | Cold-drawn |
Secondary or not: | Non-Secondary |
Grade: | Incoloy 825 |
O.D.: | 1-600mm |
W.T.: | 1.0-18mm |
Length: | According to customers' requirement |
Section shape: | Round |
Surface Treatment: | Bright Annealed/ Polished |
Powder Or Not: | Not Powder |
Company Info. |
TORICH INTERNATIONAL LIMITED |
Verified Supplier |
View Contact Details |
Product List |
ASTM B423 Incoloy 825 UNS N08825 Nickel alloy seamless pipe / tube
Applications: Manufacturing, The steam turbine,Cryogenic
Technique: Cold Drawn
Alloy or not: Alloy
Secondary or not: Non-Secondary
Steel Grade/Steel Material: Incoloy 825
Size range:
O.D. | 1-600mm |
W.T. | 1.0-18mm |
Length | max 12000mm |
Characteristic:
Good concentricity
Good OD and ID tolerance
High Precision
Stable quality
Smooth Roughness
TORICH QUALITY ASSURANCE
Chemical Composition:
Item | Chemical Composition (%) | ||||||||||||
Incoloy 825 | C | Mn | Si | S | Cr | Ni | Fe | Cu | Al | Ti | P | Mo | |
≤0.05 | ≤1.0 | ≤0.5 | ≤0.03 | 19.5-23.5 | 38.0-64.0 | bal. | 1.5-3.0 | ≤0.2 | 0.6-1.2 | ≤0.03 | 2.5-3.5 |
Product Show:
FAQ:
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
![]() |