Sign In | Join Free | My frbiz.com |
|
Categories | Steel Frame Dining Chairs |
---|---|
Brand Name: | Master Furniture |
Model Number: | 0007# |
Certification: | SGS /BIFMA |
Place of Origin: | Guangdong,China |
MOQ: | 10 pieces |
Price: | Negotiate |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 5000 pieces per month |
Delivery Time: | 5 days for LCL order ,15 days for 20GP, 30 days for 40HQ |
Packaging Details: | Stardard export packaging |
Place of origin: | Foshan,Guangdong |
Category: | Commercial Furniture / Home Furniture |
Type: | Dining Room Chair / Kitchen Chair / Side Chair |
Item code: | 0007# |
Material: | Metal |
Metal: | Brushed steel frame |
Interior structure: | Formed solid wood bending board |
Infilling material: | High quality density foam |
Style: | Modern,Luxury |
Surface material: | Synthetic leather / Fabric |
Packaging: | 2PCS /CTN |
FOB port: | Shenzhen or Guangzhou |
Delivery time: | Normally 15 -20 days after deposit for 40HQ |
Adjustable: | No |
Colours: | Customized |
Company Info. |
Foshan Master Furniture Co.,Ltd. |
View Contact Details |
Product List |
Green Velvet Upholsterey Stee Framel Dining Chair Armless Used
Kitchen Room Chairs With Black Leg 0008
Product Features:
Product Details:
Manufacturer | Chuang Xinyi |
Product number | 0008# |
Material | Metal |
Metal material | Steel |
Major structure | Plywood frame |
Infilling | High-density sponge |
Surface material | Velvet |
Pattern | No |
Style | Modern |
Structure technology | Metalwork |
Metal structure technology | Incised |
Customized | Yes |
Washable | Yes |
Additional function | removable |
Applicable | Adult |
Storage space | No |
Place of origin | Foshan,Guangdong |
Assembled | No |
Design element | Metalware |
Style positioning | Artistic style |
Installation instructions | No |
Packing Details | Plastic bag protect the wooden leg, outside in carton that is the normal packing way and we can even de special UPS packings or Mail Order Packing as customers required. |
Packaging Details:
1. All items would be covered with a plastic bubble wrap or soft
paper,to ensure that the legs and the fabric would not be damaged.
2. The outer carton would be 5 ply double walled corrugated case.
3. Other request package of is available.
Lead Time:
Quantity(Pieces) | 1 - 50 | 51 - 100 | 101 - 500 | >500 |
Est. Time(days) | 5 | 10 | 15 | To be negotiated |
Product Display:
The stitching line is neat, professional production, pay attention
to the thread, and integrate
with the chair body. Make the seat more beautiful
Product Measurements:
Compay Information:
Foshan Chuang Xinyi Furniture Factory is a certain furniture
company was founded in 2004,
with high ability to design and development of European and
American furniture manufacturing
enterprises, and a strong professional production and technical
team, produced all kinds of
furniture using superior materials and excellence in production
process, quality and reliable.
The company has a young sales and design and development team, with
culture of "the pursuit
of innovation, the inherit of classic", make full use of
international brands of furniture manufacturing
experience, introduce international advanced management idea and
technology, with the perfect
combination of Western classical art and design of the Oriental
aesthetic elements, to provide
global customers high-quality products.
RFQ:
1Q: What is your minimum order quantity? Do you accept sample
order?
1A: Our MOQ is 1*40HQ container for 1 up to 5 models mixed,
Yes, here we also accept sample order for test quality, the sample
charge is twice the wholesale price, and this
charge would return to your bulk order’s total amount.
2Q. Could you offer customize service?
2A: We are capable of tailor kinds of products according to customers’
requirements. Here we have professional
designers team and could make kinds of new sample.
3Q: What's your lead time? How about the payments term?
3A: Normally our lead time is about 15-20 working days after received your deposit.Our payment term is usually
paid 30% deposit by T/T before production and then 70% balance should be paid off upon the copy of B/L.
![]() |