Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Water Treatment >

High Temperature 10 Ton Membrane Water Wall Panels

Categories Water Wall Panels
Brand Name: ORL Power
Model Number: Customization
Certification: ISO9001/SGS/TUV/ASME/EN
Place of Origin: Zhangjiagang,Jiangsu,China
MOQ: Negotiable
Price: Negotiable
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 500Ton/Tons per Month
Delivery Time: 50~100 Days
Packaging Details: Iron Frame Package
Name: Water Wall Panels
Usage: Industry/Power Station
Structure: Fire/Water Tube
Fuel: Coal/Gas/Oil-fired, Water Heat
Output: Hot Water/Steam
Dimension(L*W*H): Customization
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Temperature 10 Ton Membrane Water Wall Panels

High Temperature Hot Water Heaters Water Wall Panels


Water Wall Panels Boiler Parts


Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube.


Water Wall Panels Introduction


A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.


Water Wall Panels Parameters


NameMembrane water panel
MaterialCarbon steel,Alloy steel,etc.
Tube sizeΦ38 - 76 mm, Customization
StandardISO , ASME
ModelStudded
DimensionCustomization
Manufacturing processMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation locationaround the boiler combustion chamber

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater



Quality High Temperature 10 Ton Membrane Water Wall Panels for sale
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0