Sign In | Join Free | My frbiz.com |
|
Categories | Stainless Steel Blower |
---|---|
Brand Name: | DAJING |
Model Number: | 4-73C |
Certification: | CE/ISO9001/3C |
Place of Origin: | HENAN PROVINCE, CHINA |
MOQ: | 1 |
Price: | Negotiable |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 500+sets+per month |
Delivery Time: | 10-60 days |
Packaging Details: | Packed in wooden box, rainproof cloth, container, according to customer requirements. |
Pressure: | Medium Pressure |
Application: | Exhaust Ventilation |
Feature: | Anti-Corrosion |
Impeller: | Backward Impeller Blade |
Usage: | Induced draft fan |
Electric Current Type: | AC |
Corrosion-Resistant Stainless Steel Blower Fan Low Noise Belt Drive
This series of centrifugal fan has high efficiency, low noise and stable performance curve. It is usually used for flue gas recovery device. The flue gas desulfurization filtering treatment device is usually installed before the centrifugal fan. Centrifugal fans without flue gas treatment equipment should be made of stainless steel.
Corrosion-Resistant Stainless Steel Blower Fan Low Noise Belt Drive | |||
Centrifugal fan | Air Flow | 8000~50000 | m3/h |
Pressure | 900~3400 | Pa | |
Rotating speed | 2900/1450/960/730 | r/min | |
Material | Stainless steel/Stainless Steel | ||
Motor | Power | 4~55 | kw |
Voltage | 220/380/440/6000/6600 | v | |
Frequency | 50/60 | hz |
1. This series of centrifugal fans have the advantages of low
noise, high air volume and high full pressure.
2. The casing is made of high quality plate, the structure is firm,
the surface is sprayed, and the service life is long.
3. Adopt forward tilt type, multi-wing impeller, high wind
pressure, good ventilation effect
4. The motor installed outside the box is type A(Can be used for
fire smoke exhaust ), and the motor installed outside the box is
type B(Generally used for ventilation ).
5. It can be made of high quality all stainless steel according to
the special needs of customers.
Centrifugal fan production process:
Case Show:
FAQ
Q1: What is the delivery term for making business?
A: In general, we send the shipment in FOB term. However, the terms
of CIF and C&F are acceptable which depends on the preference
of the client.
Q2: What about the lead time?
A: Sample needs 5-7days, mass production time needs 7-30 days for
order quantity more than MOQ.
Q3: What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4: How do you control the product’s quality?
A: All the products have quality testing and dynamic balance before
delivery.
![]() |