Sign In | Join Free | My frbiz.com |
|
Categories | Carbon Fiber Wheelchair |
---|---|
Brand Name: | KK |
Model Number: | Cfw4 |
Certification: | CE,RoHS |
Place of Origin: | China |
MOQ: | 1 |
Price: | Negotiation as per customer's project |
Payment Terms: | T/T, Paypal, Western Union, L/C |
Supply Ability: | 500pcs per week |
Delivery Time: | 3~7 working days |
Packaging Details: | Usually paper, EPE foam, Poly bag or PP bag and standard carton boxes or wooden boxes for final packing. we also can pack and ship as per customer's request. |
Quality: | Quality is our Culture |
Tolerance: | +/-0.005mm ~ +/-0.01mm |
Application: | Bike, medical equipment |
Process: | compression molding |
Type: | Turning, Milling, Broaching, Etching / Chemical Machining, Other Machining Services |
Quality control: | Micrometer, CMM, Height Gauge, inside micrometer |
Customized: | OEM & ODM Support |
Other: | Robot lightweight design |
Surface: | 3K, 6K, twill, plain, colorful |
Super light tubeless / tubular customized Carbon Fiber Road Bicycle Wheels Rim RT 700C , high end Racing wheelset Rims
Our core competency
Business Type | Manufacturer / Factory / Exporter |
Services | CNC Machining, CNC Turning and Milling |
Jig and Fixture | |
Carbon fiber composite product manufacturing | |
Robot lightweight design | |
OEM & ODM Components and Parts |
Application for the 3k carbon fiber tubes, carbon fiber pipes, colored carbon fiber tubes,
Carbon Fiber panels, Real Carbon Fiber Sheet & Carbon Fiber plate
• Automotive
• Sporting Goods
• Light Aircraft Tubing
• Advertising Panels
• Construction
• Robotic Arms & Supports
• Advertising Panels
• Power Generation
• Corrosion Resistant Equipment Marine
• Drilling Equipment
• Mechanical Equipment
• Photography & Sound Booms
• Gun and furniture
• Waste water Treatment
• Conveyor System Rollers
• Chemical Filtration
• Oil and Gas Exploration
• Petrochemical Applications
• Packaging Equipment Framework
• Medical Equipment Components
FAQ |
Q1. When can I get the price? |
A: We usually quote within 2 days after we receive the RFQ or feedback |
Q2. No 2D/3D drawing, how should I start the new project? |
A: Send details and requirement first, our engineers will discuss and help work on the drawing for you accordingly. |
Q3. How do I know about the production and quality? |
A: We will double check requirements and send the sample for your
confirmation before mass production. During the production, we will keep you informed of each progress, and do 100% quality inspection before shipment. |
Q2. Lead time |
A: Normally our lead time is 3-5 days. |
![]() |