Sign In | Join Free | My frbiz.com |
|
Categories | Steel Structure Workshop |
---|---|
Brand Name: | Homeshore |
Model Number: | CAGJG-001 |
Certification: | ISO9001 |
Place of Origin: | China |
MOQ: | 400 square meters |
Price: | Negotiation |
Payment Terms: | T/T, Western Union,, L/C |
Supply Ability: | 1500 ton per Month |
Delivery Time: | 20-30 working days |
Packaging Details: | Wooden bar, Cable Strip, Pallet, Wooden Box, etc. |
Surface Treatment: | HDP or Painted |
Application: | Workshop or Warehouse |
Frame Finishing: | Powder Coated |
Centilation: | Turbine Vent Or Ridge Ventilation |
Design Code: | China GB code |
Size: | Customized |
Easy Installation Economic Movable Pre-engineered Industrial Steel
Structure Workshop
Main Materials of Easy Installation Economic Movable Pre-engineered
Industrial Steel Structure Workshop
Main Materials | |||
Main steel frame | Column | Q235, Q345 Welded H Section Steel | |
Beam | Q235, Q345 Welded H Section Steel | ||
Secondary Frame | Purlin | Q235 C and Z purlin | |
Knee brace | Q235 Angle Steel | ||
Tie Rod | Q235 Circular Steel Pipe | ||
Brace | Q235 Round Bar | ||
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | ||
Maintenance system | Roof Panel | Steel Plated, Sandwich Panel(EPS/PU/Firberglass/RockWool) | |
Wall Panel | Steel Plated, Sandwich Panel(EPS/PU/Firberglass/RockWool) | ||
Accessories | Window | Plastic steel or Aluminum alloy window | |
Door | Rolling safety door or Sliding door | ||
Rainspout | PVC |
Our advantages:
1. Cost saving and transportation convenient, custom design
available
2. The main beam and column are made of quality steel
3. Steel structure makes the house resist heavy wind of 220km/h and
8-grade earthquake
4. Easy assembly and disassembly several times without damage
5. Good environmental protection effect. Steel structure housing
construction greatly reduces sand, stone and dosage of the ash.
Most of the used materials are recyclable or degradable, little
rubbish produced
6. Production according welding rules a = 0.7(1.0) x thickness of
web;
7. Continuous welding on both sides of each pieces;
8. Own the hot dip galvanize zinc pool ourself,pool
size:12.5x1.6x2m(LXWXD);
9. Mark every beam on the bottom plate for being saw after being
galvanized;
10. Send pictures to the buyer by mail during products being
processed and loaded in container;
11. Near the Qingdao port,only need 1.5hour by car,the land
transport cost cheaper;
12. Near the Qingdao International airport, only need 0.5hour by
car, the client can visit us easily.
Packing Materials&Loading:
Packing materials:
Bottom steel rack
Cable wire
Timber
Packing straps
Wooden box
Carton box, etc.
Loading & unloading:
Use 2-3 forklifts to lift the package up and pushed slowly by the
end forklift into the 40'GP/40'HC/40'OT containers. The unloading
is the same.
![]() |