Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Power Distribution Equipment >

Stainless Steel Runner Pelton Water Turbine Generator Unit Remote Monitoring

Categories Hydro Turbine Generator
Place of Origin: Sichuan, China (Mainland)
Brand Name: Foster
Model Number: CJ237-W-55/1*6
Supply Ability: 30 Piece/Pieces per Month
Packaging Details: wood box
MOQ: 1 Piece/Pieces
Price: Negotiable
Certification: CE/TUV/ISO9001/From-E
Payment Terms: L/C, T/T
Delivery Time: 120days
Design head: 140-260m
traffic: 0.108-0.220m3/s
the output: 266-503kw
design speed: 600-1000 r/min
driving mode: sraight league
valve: 250mm
color: Customer's Requirements
type: Pelton
keyword: Pelton water turbine generator
certificate: ISO9001/CE/TUV
Port: shanghai/shenzheng
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Stainless Steel Runner Pelton Water Turbine Generator Unit Remote Monitoring

50kw - 250kw Stainless Steel Runner Pelton Water Turbine Generator Unit Remote Monitoring For Hpp


Our main products included:


1. Kaplan turbine generators series.


2. Turgo turbine generators series.


3. Tubular turbine generators series.


4. Francis turbine generators series.


5. Pelton turbine generators series.


Product features:


In the Pelton turbine, the nozzle (equivalent to the guide mechanism of the counterattack turbine) is used to guide the flow, regulate the flow, and convert the liquid mechanical energy into jet energy. In addition to guiding water flow and regulating flow, a certain rotating water flow is formed in front of the runner to meet the requirements of different specific speeds for the front circulation of the runner.

1.suitable for high head,small flow and flow changes in large runoff hydropower station.


2.With the power plant investment is small,compact units structure characteristics.


3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.


4.Suitable for high head,small flow station in mountainous area.


5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.


Product parameters:


CJ237-W-65/1x7.5 Hydro Tubine Performance Data And Supporting Table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorRated speed(r/min)Runaway speed(r/min)Vavel controlGuide vane controlDiameter (mm)
Flow rate (m3/s)The output(kw)
CJ237-W-65/1x7.5500.13453410557501500Direct connection or Belt connectionautomatic/ManualZ41H-2.5300
600.14869.7150557501500automatic/Manual
700.15989.8486757501650
800.17108520100500900automatic/Manual
900.1811295501256001080
1000.191525801256001080automatic/Manual
1100.1991746101606001080
1200.2081976362006001080automatic/Manual
1300.2142206622006001350
1400.2252506882507501350automatic/Manual
1500.2332797132507501350
1600.2413087363207501350automatic/Manual
1700.2483557583207501350
1800.2543627793207501350automatic/Manual
1900.2623908004007501350
2000.2694228204007501350automatic/Manual
2100.2754488404007501350
2200.2824488604007501350automatic/Manual
2300.28851888050010001800
2400.29455790050010001800automatic/Manual

Product pictuers:


Installation picture:


Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?


Quality Stainless Steel Runner Pelton Water Turbine Generator Unit Remote Monitoring for sale
Send your message to this supplier
 
*From:
*To: Chengdu Forster Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0