Sign In | Join Free | My frbiz.com |
|
Categories | Steel Slitting Lines |
---|---|
Brand Name: | Sussman |
Model Number: | RF-DF |
Certification: | CE, SGS, ISO |
Place of Origin: | Wuxi, China |
MOQ: | 1 set |
Price: | USD35999-45999 Per Set |
Supply Ability: | 5 SETS PER MONTH |
Delivery Time: | 50 days after deposit |
Packaging Details: | Film and steel |
Style: | Cut to lenth machine |
Material: | Galvanized steel, Carbon steel and others G550MPA |
Thickness: | 0.5-1.5mm |
Width of coiled plate: | 1500mm |
Line speed: | 0-30m/min |
Loading capacity: | 5T |
Material of leveling rollers: | 42CrMo,hardness:HRC52-60 |
Tolerance: | ≤±2mm/2000mm |
Power: | 220 V, three-phase electricity, 60 Hz |
Company Info. |
Sussman Machinery(Wuxi) Co.,Ltd |
Verified Supplier |
View Contact Details |
Product List |
Hydraulic Automatic Cutting To Length Machine For 0.5-1.5mm Galvanized Steel
Machine lists
5 ton Mechanical Electrical De-coiler | 1 set |
Leveler machine | 1 set |
Cutting machine | 1 unit |
Receivable table | 1 unit |
hydraulic station | 1 unit |
PLC controlling system | 1 unit |
Details of Each Composition
Structure: four connection rods adjust manually and mechanically and the motor drives the steel coils doing uncoiling. Specification: 508×1250(width of roller)
◆It is composed of 17 working roller, driving device, 2 pinch code rollers and machine frame.
◆the function of supporting roller: make the even rollers receive the balanced force and reduce the friction of the leveling rollers
◆Drive model: all the independent rollers and gear box are driven by 30kw frequency conversion
◆shear model: cut from up to down hydraulically.
◆Cooperate with the signal direct from the feeder
and shear automatically
◆Adopt gap adjusting design to cut the materials and can shear 1mm steel plate safely .
◆It is welded by steel(6m)
◆Ensure the using of hydraulic parts
◆The working pressure of the hydraulic system is 6.3-16Mpa
◆Hydraulic tank capacity is 100 liters
PLC control mode, It is controlled by LCD screen.
IV. The foundation engineering of the equipment
◆The seller will provide the buyer the foundation plan of the equipment in 30 days after signing contract.
◆The construction and monitoring of all the foundation engineering of the equipment are in the control of the buyer.
◆The foundation holes are reserved holes, to match the foot holes of equipment.
◆After the equipment has been installed, the buyer is responsible for the foundation hole irrigation mud.
Machine photos
![]() |