Sign In | Join Free | My frbiz.com |
|
Categories | Formwork Tie Rod System |
---|---|
Brand Name: | HORIZON |
Model Number: | Slope super plate |
Certification: | SGS |
Place of Origin: | CHINA |
MOQ: | 5000 pcs |
Price: | pls ask HORIZON |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 pcs per week |
Delivery Time: | 15-25 days |
Packaging Details: | pallets, bundles, bulk |
Material: | ductile cast iron |
OEM: | Available |
finishing: | natrual colour, galvanized |
Size: | with plate dia 120mm |
Application: | to fix inlcined formwork |
Weight: | 1.1kg, 1.3kg |
Samples: | available |
Tech. process: | casted |
Company Info. |
HORIZON FORMWORK CO., LTD. |
View Contact Details |
Product List |
Casted Slope Super Plate With Wing Nut for Inclined Formwork System
The Slope Plate is a combination of a wing nut and a plate, used for inclined formwork. The wing nut is undetachable from the plate. Both the plate and the nut are cast.
The articulation of the wing nut is approx. 15° for square plates and 5° for round plates.
Item No. | Bar dia (mm) | Plate dia(mm) | Weight(kg) |
SP-120H | 15 | 120 x 120 | 1.28 |
SP-120L | 15 | 120 x 120 | 1.1 |
SP-Ø120 | 15 | Ø120 | 1.0 |
SP-Ø130 | 20 | Ø130 | 1.0 |
Part Name | Specification | Weight (kg) | Remark |
Tie-rod | D15 D20 | 1.5 kg/m 2.7 kg/m | L=6m; Special length available upon request. |
Slope Super plate | D15 | 1.28 | Used in case of tie-rod and formwork panels are not vertical. |
3-lug wing nut | D15 D20 | 0.97 0.78 | For tie-rod D15; For tie-rod D20 |
Waling plate | 120 x 120 x 6, Φ19 120 x 120 x 8, Φ19 | 0.65 0.85 | For tie-rod and nut D15; galvanized |
Water stopper | D15 D20 | 0.55 0.72 | Used in water resistant wall; With tie-rod D15 / D20 |
Anchor plate | D20 | 0.95 | Embedded in concrete as lost part |
Packing:
1. Generally, the total net weight of loaded container is 22 tons
to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days
after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for
years, supplying: Formwork systems, scaffolding systems and related
accessories, which are widely used in commercial, residential and
infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork,
flexible slab formwork, frame scaffolding system, ringlock
scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line,
and pre-packing, which ensures the reliable product quality as per
customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a
comprehensive and complete concrete formwork and scaffolding
solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
![]() |