Sign In | Join Free | My frbiz.com |
|
Categories | Electrical Appliance Tester |
---|---|
Brand Name: | HongCe |
Model Number: | TL-1 |
Certification: | TUV、ITS、CSA、BV、SGS 、CNAS(cost additional) |
Place of Origin: | China |
MOQ: | 1 set |
Payment Terms: | T/T |
Supply Ability: | 15 set per month |
Delivery Time: | 25 days |
Packaging Details: | Plywood |
Price: | Negotiatable |
Interval Time: | 0-999.9s |
Test Times: | 0-9999 times |
Cycle Times: | 0-9999 times |
Temperature: | 0-999.9s |
Company Info. |
Guangzhou HongCe Equipment Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Adjustable Electrical Appliance Tester Toaster Switch Endurance Test Apparatus
Product information:
The device is used for toaster switch endurance test. It is simple, accurate, and practical, and conform to the IEC60335-2-9 clause 19.101.Toasters are operated at rated power input and under normal operation, but without bread, for six cycles of operation. The appliance is then allowed to cool to approximately room temperature. This test is carried out 500 times.
The mechanism shall operate satisfactorily and no sustained arcing shall occur. Electrical connections shall not work loose and the appliance shall withstand the electric strength test of 16.3.
Toasters, loaded with the bread specified for normal operation, are operated at rated power input. The ejector mechanism is prevented from releasing and the supply is maintained to the heating elements after the timer has completed its cycle. The test is terminated after any fire has extinguished, after which any residual bread is removed from the toaster.
Technical parameters:
Model | TL-1 |
Standard | IEC60335-2-9 |
Power Supply | AC220V,50Hz |
Output Power | 2KW |
Interval Time | 0-999.9s, adjustable |
Test Times | 0-9999 times, adjustable |
Cycle Times | 0-9999 times, adjustable |
Temperature | 0-999.9s, adjustable |
Current | 0-99.99A Displayable |
Structure And Working Principle:
Working principle: Toaster from the initial position(Lower Limit
Adjustment), push switch after an interval downstream, conduct
current, account one baking time, then back to zero and return to
the upper limit, stay for a interval time, such a reciprocating
action. Reaching to the preset roast times (6 times default), the
cooling fan is turned on, after pre-cooling time, account one cycle
time, then start the next cycle.
Maintenance:
A. Testing machine is valid for only downlink load operation when
it is not turned on, can not be up and running.
B. The parameters of the instrument has been set, do not change it
arbitrarily.
C. The device is made of metal, should be prevented from dust and
moisture environment.
![]() |