Sign In | Join Free | My frbiz.com |
|
Categories | Bridge Erecting Machine |
---|---|
Certification: | CE ISO GOST |
Place of Origin: | Henan,China |
MOQ: | Negotiation |
Price: | Negotiation |
Payment Terms: | L/C, T/T |
Supply Ability: | 5 sets per year |
Delivery Time: | 30 workdays |
Packaging Details: | Export standard packaging |
product name: | railway manufacture Bridge Erecting |
keyword: | Highway Bridge Beam Launcher |
type: | Launching Bridge Girder Erection Crane |
Rated Loading Capacity:: | 100t 200t 300t 400t |
Max. Lifting Height:: | different |
Span: | 35-50M |
work duty: | A5-A7 |
Power Source:: | 3phase 380V,50Hz |
usage: | places the prefabricated beams on the prefabricated piers |
application: | railway manufacture |
Company Info. |
Bestaro Machinery Co.,Ltd |
Verified Supplier |
View Contact Details |
Product List |
High Speed Launching Bridge Girder Erection Crane For Railway Manufacturer
The introduction of bridge erection machine:
The bridge erection machine is composed of the main beam, crane,
front legs, rear legs, front leg cylinders, rear leg cylinders and
the horizontal connection of front, middle and rear legs. The
control part consists of hydraulic system and electric control
system. The bridge erection machine is compact and reasonable in
structure, easy to install, and the main standard beams are
connected by pins. The double beam structure is connected by welded
pipes between the two frame beams.
The bridge erection machine can not only meet the standard
erection, but also meet the cross-curve erection, variable span
erection, span continuous beam, composite beam, continuous steel,
etc. It has the characteristics of good stability, high efficiency,
safety and reliability, convenient span adjustment and convenient
operation.
Bridge Erecting Machine Parameters:
Product Model | SH1000 |
Max. hanging weight(t) | 1000 |
span(m) | 50,51 |
Lifting height of trolley(m) | 56 |
Rated lifting capacity(t) | 140 |
Max. working slope | 2% |
Max. working transverse slope | 2% |
Traveling speed(m/min) | 1 |
Speed of erection of girder(day/span) | 10 |
The whole machine power(kw) | 180 |
The total weight(k) | 750 |
The performance advantages of bridge erection machine:
1. The side beams of the bridge erection machine are installed in place at one time, which greatly improves the efficiency and safety performance.
2. The bridge erection machine has good strength and rigidity, stable operation and high safety factor.
3. When the bridge erection machine passes through the hole, there is no need to lay a temporary track, and the rear support and the beam-carrying flat car share the track, which reduces the work intensity.
4. The bridge erection machine can adapt to the construction of different curved bridges, inclined bridges and straight bridges.
Bridge Erecting Machine Photo: