Sign In | Join Free | My frbiz.com
frbiz.com
Products
Search by Category
Home > Rubber Flooring >

Playground safety surface

Categories synthetic running track
Place of Origin: GUANGZHOU
Brand Name: DISHEN
Model Number: DS-TR003
Certification: SGS, IAAF,ISO
Price: 10-20USD/㎡
Packaging Details: iron barrel & plastic barrel
Delivery Time: 10 days after get deposite
Payment Terms: T/T , WESTER UNION
Supply Ability: 60 TONS PER DAY
MOQ: 2000㎡
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Playground safety surface


    1. All weather suitable
    2.Mylti-layer system
    3. Flexible, cushion, shock absorb
    4. rubber synthetize
    5. granules&PU
    PRODUCTS DETAIL & DESCRIPTION

    Playground Safety Surface

    Three System

    Full PU SystemPlayground Surface


    Sandwich System Playground Surface


    Spray Coating System Playground Surface


    Thickness: 13mm

    Color: Red, green, blue,etc.

    Subbase : Concrete or asphalt

    The thickness and color can be customised as clients' required.


    Characteristic:

    1. all weather suitable:all kinds of season and temperature range, it maintain high quality and it can be used after heavy raining, which increase the time avaliable and use frequency.

    2. clashing: it has the high flexible layer and cushion layer, which can absorb the drawing without abvious demage.

    3. viscidity: special constructing structure, it has strong viscidity, which can prevent the ascend of water, no pickle, separating etc.

    4. wear-resistence: less than 25%, suit for the demandof longtime and frequent use of all levels.

    5. weather resistence: will not fade or effloresce because of pollution by ultraviolet rays,ozone,acid rain, and can keep its fresh color.

    6.draining system: the drain system can expel seeper after heavy rain, which can enchance the efficency.


    work procedure:

    subbase layer finished-----design------base treatment-----pirmer spread----pave base layer----spary top coating layer----line making----clearance of site---mending---finished----maintains


    Subbase demand

    • concrete subbase

    1.should be keep maintaince for at least 28 days or more until water from the subbase was dry completely.

    2. should be acid picking, as the concrete was basicity.

    3. should be clean,dry, flat and without crack and stain.

    • asphalt subbase

    1. should be solid,flat,day and without sundries.


    machine perpared:


    mixing machine, spreading machine, spraying machine, line maker.


    if you can not get those four we also can offer you.


    The best chioce for you!

    1. good quality and reasonable price

    2. we are manufacture, we are the source

    3. coordinate service

    4. oversea installation is avaliable

    5. professional installation team

    oversea installation is avaliable.welcome your inquiry!


    Product Tags:

    planground

      

    planground surface

      
    Quality Playground safety surface for sale
    Send your message to this supplier
     
    From:
    To: GUANGZHOU DISHEN PLASTICS MATERIALS CO., LTD
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2020 frbiz.com. All rights reserved.