Categories | Cold Storage Of Fruits And Vegetables |
---|---|
Brand Name: | ECOOL |
Model Number: | EHT6 |
Certification: | ISO9001;CCC |
Place of Origin: | CHINA |
MOQ: | 1 set |
Price: | Negotiable |
Supply Ability: | 5 set per year |
Delivery Time: | 3-6 months |
Packaging Details: | sea-worthy packing |
Product name:: | Cold Storage Facilities For Fruits And Vegetables |
Rerigeration sytem: | Freon |
Application: | Fruits And Vegetables |
Size: | 1000 tons |
Room Temperature: | -5C~+10C |
Structure: | Steel structure assembling |
Commercial Cold Storage Facilities For Fruits And Vegetables 1000 Tons
Cold Storage Facilities For Fruits And VegetablesAdvantages:
Cold Storage Facilities For Fruits And Vegetables details:
Cold Storage Facilities For Fruits And Vegetables specification:
Room function | Designed temperature range | |
°C | °F | |
Storage room | -5 ~ + 10 | +23~+50 |
Compatitive Advantages
Word famous brand components asure the quality e.g. BITZER compressor,DANFOSS valves etc.
Steps of customized cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
WHAT DO WE DO
Cold room photos
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Help