Categories | Door Frame Roll Forming Machine |
---|---|
Brand Name: | LBM |
Model Number: | LBM-DFM-001 |
Certification: | ISO 9001: 2008 |
Place of Origin: | Wuxi City, Jiangsu |
MOQ: | 1 |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Delivery Time: | 30-40days |
Roller stations: | 18 stations |
Roller material: | Gcr15, Quench HRC58-62 Plated Chrome |
Shaft material: | 45# Steel, thermal refining |
Forming speed: | 12-15m/min; Adjustable |
Motor Power: | 15Kw |
Price: | Negotiation |
Supply Ability: | 25 Sets per Month |
Packaging Details: | Standard export packing with each machine fixed and protected in the container |
Suitable Material:: | GI, GL Strip |
Shaft Diameter:: | 75mm |
High Strength Smooth Straight Door Frame Cold Roll Forming Machine Full Automatic
1. Technical parameters of door frame roll forming machine
No. Item Description
1 Suitable Plate Material Thickness: 1.5-2.0mm, Galvanized steel or
blank steel
2 Working Speed 12-15 m/min
3 Roller quantity 18 rollers
4 Material of Roller Gcr15, Quench HRC58-62 Plated Chrome
5 Material of Shaft 45# Advanced Steel (Dia: 76mm), thermal
refining
6 Driven system gear box drive
7 Main Power with reducer 7.5KW
8 Cutting model: Hydraulic Cutting Cr12mov
9 Material of Cutting blade Cr12Mov, Quench HRC58-62
10 Hydraulic Station Power 7.5KW
11 Operation system Controlled by industry computer-PLC system.
12 PLC brand Siemens with Japan English and Chinese Language
13 Touch Screen Siemens Japan
14 Encoder Omron, Japan
15 Electric parts Schneider
2. Packaging & Shipping
Packaging :
1. Tighten to container with steel wire rope and welded machine with container by angel iron
2. Main forming machine and un-coiler is naked (If you need we can also packed with water-proof plastic)
3. PLC contral system and motor pump are packed with water proof paper
Shipping :
1. One 20" container
2. One 40"container
3. FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
4. Our service
Door frame roll forming machine Install and Training:
If buyers come to our factory to inspect, the training to install and operate is provided face to face.
If not, manual and video is provided to show how to install and operate.
After-sale Service:
We provide 12-hour online service for our customers. Phone: +86 15821208506
a .The seller will debug the machines freely in China, and the traffic expense in China of the technique people will be paid by the seller.
When technique men go to the buyer's place to debug the machines, the buyer should pay the
expense of accommodation, and round-trip tickets for the seller’s men. and pay the technician USD60 per day.
b. If the buyer sends people to receive the training of the operation given by the seller, during the training period, the seller should pay the expense of accommodation, and traffic for the buyer's men.
5. Picture
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Help